Group 62 Section Leaders Meeting, February 1,1954
(Lincoln Laboratory - Division 6, 2009-06-12)MTC will go on two shift operation next week due to heavy demand for test time. The computer will be moved to Building B late in April. -
Summary of Lincoln Laboratory Technical Information Releases (T.I.R.'s) Pertaining to Sage System Issued By The Production Coordination Office (PCO) (Cumulative List Through 1 April 1955)
(Lincoln Laboratory - Division 6, 1955-04-05)The summary is a catalogued listing of Series 1 TIR's pertaining to the Sage System that have been issued to date and indicates present status. The PCO is an office established by the Lincoln Director's Office to serve as ... -
Group 62 Section Leaders Meeting -- January 18, 1954
(Lincoln Laboratory - Division 6, 2009-06-12)Program for development of phone line specifications for reliable data transmission to be carried out by joint Bell System--Lincoln committee. For XD-1, 300 µsec maximum delay in a triad of lines will be used as design ... -
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, March 1 thru March 31, 1954
(Lincoln Laboratory - Division 6, 1954-04-08)The Typotron tube was selected for Digital Information Display units. Engineering development work is continuing and has led to the approval by Lincoln of the specification for a number of portions of the system. Planning ... -
Lincoln Division 6 Group Organization List
(MIT Digital Computer Laboratory, 1954-01-12)Memorandum listing Lincoln Division 6 Group Organization. -
Summary of Lincoln Laboratory Technical Information Releases (TIR's) Issued By The Production Coordination Office (PCO) (Cumulative List Through 17 November 1954)
(Lincoln Laboratory - Division 6, 1954-11-29)The summary is a catalogued listing of TIR's that have been issued to date and indicates present status. The PCO is an office established by the Lincoln Director's Office to serve as the contact point at Lincoln in connection ... -
Group 62 Section Leaders Meeting--May 10, 1954
(Lincoln Laboratory - Division 6, 1954-05-12)Memorandum on the Group 62 Section Leaders Meeting of April 26, 1954. -
Laboratory Personnel
(Lincoln Laboratory - Division 6, 1954-08-02)Memorandum listing Laboratory Personnel of Division 6 - Lincoln Laboratory. -
Evaluation of Ferroxcube Cores
(Lincoln Laboratory - Division 6, 1954-06-28)A 1000-core lot, Ferroxcube 170T025A402, was evaluated to determine its usefulness as memory core. The squareness and signal ratios of this lot were excellent. Its uniformity was good. The switching time of this lot, ... -
Laboratory Personnel
(MIT Digital Computer Laboratory, 1954-02-01)Memorandum listing Laboratory Personnel of the MIT Digital Computer Laboratory. -
Section Leader Minutes - Meeting of June 5, 1954
(Lincoln Laboratory - Division 6, 1954-06-08)The Air Force is establishing a Joint Progress Office -- JPO -- to coordinate administrative activity for the Transition System Program. Col. R. Osgood will be chairman. The Lincoln Production Coordination Office has been ... -
Use of Silver in Etched-wiring Cards
(Lincoln Laboratory - Division 6, 1954-02-03)Silver migration occurs easily through and across the surface of a variety of materials in the presence of moisture and unipolar potential. The behavior of silver is peculiar in that it may migrate more easily than any ... -
Group Organization List
(Lincoln Laboratory - Division 6, 1954-10-01)Memorandum listing group organization of Lincoln Laboratory Division 6. -
Group 62 Section Leaders Meeting -- February 23, 1954
(Lincoln Laboratory - Division 6, 1954-02-24)MIT has started an increased program of assistance in connection with memory design. All future core testing is to be done at IBM. Charactron tubes are to be secured from Convair for XD-1 and XD-2. -
Proposed Changes in FSQ-7 Memory
(Lincoln Laboratory - Division 6, 1954-07-13)A significant reduction of the cathode count coupled with an increase in operating speed of the FSQ-7 Memory banks can be achieved by a redesign of some of the sections of Memory. In order of increasing difficulty these ... -
Summary of Lincoln Laboratory Technical Information Releases Pertaining To The Sage System Issued By The Production Coordination Office (Cumulative List Through 31 December 1955)
(Lincoln Laboratory - Division 6, 1955-12-31)The summary is a catalogued listing of Technical Information Releases pertaining to the Sage System that have been issued to date and indicates present status. The Production Coordination Office is an office established ... -
A Magnetic-Core Memory With External Selection
(MIT Department of Electrical Engineering, 1954-04-06)Master's Thesis Proposal: A Magnetic-Core Memory With External Selection. -
Section Leaders Meeting, September 20, 1954
(Lincoln Laboratory - Division 6, 1954-09-21)Section Leaders Meeting will be held on Friday afternoon henceforth. Pulse line termination method is proving troublesome in XD-1 testing. Phone line demodulator design should attempt to avoid necessity of individual tuning ... -
Summary of Lincoln Laboratory Technical Information Releases Pertaining to Sage System Issued By The Production Coordination Office (Cumulative List Through 7 July 1955)
(Lincoln Laboratory - Division 6, 1955-07-13)The summary is a catalogued listing of Technical Information Releases pertaining to the Sage System that have been issued to date and indicates present status. The Production Coordination Office is an office established ... -
Multi-Coordinate Selection Systems for Magnetic-core Storage
(MIT Department of Electrical Engineering, 1954-01-19)Master's Thesis Proposal: Multi-Coordinate Selection Systems for Magnetic-core Storage.