Now showing items 761-780 of 1737

    • Results of the system test performed on the AN/FSQ-7 (XD-1) during June 1955 

      Crane, J. D. (Lincoln Laboratory - Division 6, 1955-08-25)
      Memorandum disseminating the results of a system test performed on the central computer portion of the AN/FSQ-7 during the month of June 1955.
    • Minutes of concurrence meeting no.18 

      Jones, N. T.; Rising, H. K. (Lincoln Laboratory - Division 6, 1955-03-08)
      Minutes of the concurrence meeting discussing auxiliary drum specifications and outputs specifications.
    • Specifications for the central computer for the AN/FSQ-7, supplement 3 

      Shorey, R. R. (Lincoln Laboratory - Division 6, 1955-08-24)
      The AN/FSQ--7 specifications for the Central Computer System as recommended by Lincoln Laboratory vere listed in 6M-3291 (released by TIR 1-57), 6M-3291, Supplement 1 (released by TIR 1-66), and 6M-3291* Supplement 2 ...
    • Minutes of the IBM-L/L SO concurrence meeting no.50 held at Lincoln Laboratory 5 January 1956 

      Giordano, J. (Lincoln Laboratory - Division 6, 1956-01-09)
      Minutes of an IBM-SO concurrent meeting discussing SD console visitors; label changes; digital data transmitter specifications; change to crosstelling input specifications; satellite control cable assembly; and master ...
    • SAGE system meeting, January 31, 1955 

      Bragar, P. (Lincoln Laboratory - Division 6, 1955-01-31)
      Minutes of weekly SAGE System meeting discussing recruiting, study of long-range objectives, status of Exhibit 17, status of DDR-DDT's, non-credit courses, and auxiliary memory.
    • Master reference list of equipment specifications for XD-1 

      Giordano, J. (Lincoln Laboratory - Division 6, 1956-02-07)
      Third supplement to 6M-3851-1, master reference list, dated 11 October 1955, issued by the design control section. Includes only concurred changes, revisions, and clarifications to XD-1.
    • SAGE System meeting 11 April 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-04-11)
      Minutes of weekly SAGE System meeting discussing joint services advisory committee, programming meeting, coordination meeting, display meeting, computer time on MTC, Division 6 participation in radar study, acceptance tests ...
    • Laboratory Personnel 

      Digital Computer Laboratory Administrative Staff (MIT Digital Computer Laboratory, 1954-04-01)
      Memorandum listing Laboratory Personnel of the MIT Digital Computer Laboratory.
    • A Comparison Between Square-Loop Metals and Ferrites for High-Speed Pulsed Operation 

      Brown, David R.; Buck, Dudley A.; Menyuk, Norman (Lincoln Laboratory - Division 6, 1954-02-04)
      Metals and ferrites with rectangular hysteresis loops are used in magnetic amplifiers, switching networks, and data-storage systems. In these applications, the large-signal pulse response is most important. To reduce the ...
    • Ferrite Synthesis II 

      Vinal, Francis E. (Lincoln Laboratory - Division 6, 1954-02-17)
      The systematic investigation of the MgO-MnO-Fe₂O₃ system for which preliminary results were reported in Memorandum M-2442, has been extended and verified. The patterns of loop squareness vs. composition have remained ...
    • XD-I Digit-Plane Driver 

      Shansky, David (Lincoln Laboratory - Division 6, 1954-05-28)
      A self-balancing bridge is utilized in conjunction with an "and" and an "or" gate input to satisfy the wave form and gating specifications on the driver for a magnetic core memory digit plane winding.
    • Summary of Lincoln Laboratory Technical Information Releases Pertaining To The Sage System Issued By The Production Coordination Office (Cumulative List Through 31 March 1956) 

      Robertson, G. W. (Lincoln Laboratory - Division 6, 1955-04-09)
      The summary is a catalogued listing of Technical Information Releases pertaining to the Sage System that have been issued to date and indicates present status. The Production Coordination Office is an office established ...
    • Group 62 Section Leaders Meeting -- January 11, 1954 

      Gray, Philip J. (Lincoln Laboratory - Division 6, 2009-06-12)
      It is very likely that the MTC computer will be moved to Lexington in May or June of this year. Installation of the drum and memory for MTC is expected to start the week of January 18. A preliminary description of the ...
    • Reasons for Rejection of Suggested Changes to Specifications for AN/FSQ-7 Display System 

      von Buelow, Robert (Lincoln Laboratory - Division 6, 1954-01-25)
      This office asked for comments on the Specifications for AN/FSQ-7 Display System from all concerned parties. These comments were either favorably considered and incorporated in the addendum to the specifications or were ...
    • Group 62 Section Leaders Meeting, September 24, 1954 

      Kromer, A. P. (Lincoln Laboratory - Division 6, 1954-09-27)
      Active consideration is being given to having IBM - Endicott take on the engineering responsibility for the Central Display System (Fallows' work) and the associated expanded display (projection). Combined frame testing ...
    • Distribution Procedure for Laboratory Memorandum 

      Falcione, A. M. (Lincoln Laboratory - Division 6, 1954-03-01)
      The progress and degree of success of any project requires that all interested personnel be kept informed on all phases of the latest engineering developments, which may or may not affect their particular phases of work ...
    • Group 62 Section Leaders Meeting - September 7, 1954 

      Mayer, Rollin P. (Lincoln Laboratory - Division 6, 1954-09-17)
      Portions of Project High have been reorganized. Assembly and test of XD-1 is progressing very well. The Charactron is being tested with MTC.
    • Group 62 Section Leaders Meeting--April 20, 1954 

      Kromer, A. P. (Lincoln Laboratory - Division 6, 1954-04-21)
      The Transition Systems inputs, duplex operation concepts, weapons control capabilities, phone line transmission requirements were discussed at a recent conference with Air Force and ADES representatives. The display selection ...
    • Group 62 Section Leaders Meeting -- March 1, 1954 

      Kromer, A. P. (Lincoln Laboratory - Division 6, 1954-03-02)
      Test of IBM mapper with WWI have been completed. An enlarged display section will handle development of display generation and selection frames. IBM will subsequently construct these units. Planning for tests of XD-1 at ...
    • Transformer Drive for a Coincident-Current Magnetic Memory 

      Gates, Earle K. (MIT Digital Computer Laboratory, 1954-01-05)
      Master's Thesis Proposal: Transformer Drive for a Coincident-Current Magnetic Memory.