Project Whirlwind Reports: Recent submissions
Now showing items 421-440 of 1719
-
Secret supplement to Biweekly Report for Decemer 18, 1953
(Lincoln Laboratory - Division 6, 1953-12-18)Memorandum detailing a meeting held between Division 6 staff and three representatives of the Lockheed Aircraft Company to discuss the use of the L-253 weapon system with the Transition System, the test routines for all ... -
Secret supplement to Biweekly Report of January 29, 1954
(Lincoln Laboratory - Division 6, 1954-01-29)Memorandum detailing a complete simulation of the F-99 interceptor performance and the evaluation of the improvement of tracking accuracy resulting from the use of radial velocity information available at the MTI radar sites. -
Secret supplement to biweekly report for September 24, 1954
(Lincoln Laboratory - Division 6, 1954-09-24)The simulation required for the investigation of the ability of the SAGE System to guide the F-99 Interceptor was completed and the results sorted with the help of IBM equipment. The results of 14,200 separate interceptions ... -
Secret supplement to Biweekly Report for June 4, 1954
(Lincoln Laboratory - Division 6, 1954-06-04)Memorandum detailing the results of the preliminary simulation of the F-99 Interceptor in the Lincoln environment, presented in Memorandum M-2811 in graphical form. -
Conference regarding proposed modification to delivery schedule for AN/FSQ-7 duplex centrals - June 9 and 10, 1954
(Lincoln Laboratory - Division 6, 1954-06-11)Proceedings of a conference called by the AMC Joint Progress Office to discuss the proposed modification to the delivery schedule for AN/FSQ-7 duplex centrals. The agenda surrounded the following topics: field trials for ... -
Secret supplement to Biweekly Report for May 7, 1954
(Lincoln Laboratory - Division 6, 1954-05-07)Memorandum detailing a meeting held at Westinghouse on May 6-7, 1954, to clarify mutual problems involved in making Bomarc Ground Control Network compatible with the Lincoln Transition System and to prepare proposals for ... -
Secret supplement to Biweekly Report of March 26, 1954
(Lincoln Laboratory - Division 6, 1954-03-26)Memorandum detailing analysis of the 25 interception runs mentioned in the last secret biweekly report (M-2723) and 37 further runs made after correction of errors. -
Secret supplement to Biweekly Report for July 2, 1954
(Lincoln Laboratory - Division 6, 1954-07-02)Memorandum detailing the modification of the F-99 interception stimulation program and a permutation program written to generate 600 situations. -
Secret supplement to Biweekly Report of April 9, 1954
(Lincoln Laboratory - Division 6, 1954-04-09)Memorandum detailing 3000 (out of 6000) tracks run on the Lincoln Transition System. -
Division VI Lincoln Laboratory engineering drawing log book
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered A-47000 through SC-47199. -
Division VI Lincoln Laboratory engineering drawing log book
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered E-42000 through A-42083. -
Division VI Lincoln Laboratory engineering drawing log book
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered B-58107 through SB-59995. -
Drawing numbering system used at M.I.T. Lincoln Laboratory Div. 6 (Lex.)
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered A-40400 through SA-40579. -
Division VI Lincoln Laboratory engineering drawing log book
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered SB-45000 through A-45391. -
Division VI Lincoln Laboratory engineering drawing log book
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered B-37000 through A-37499. -
Division VI Lincoln Laboratory engineering drawing log book
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered A-59996 through SB-62099. -
Drawing numbering system used at M.I.T. Lincoln Laboratory Div. 6 (Lex.)
(Lincoln Laboratory - Division 6, 2009-06-17)Table demonstrating the Division 6 drawing numbering system. Also includes WWI numbers. -
Division VI Lincoln Laboratory engineering drawing log book
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered SA-39000 through SB-40399. -
Drawing numbering system used at M.I.T. Lincoln Laboratory Div. 6 (Lex.)
(Lincoln Laboratory - Division 6, 2009-06-17)Log of Division 6 engineering drawings numbered A-42101 through A-43854. -
WWI general numbers 55,002 thru 59,995
(2009-06-16)Log of WWI drawings numbered B-55002 through SB-58106.