Project Whirlwind Reports: Recent submissions
Now showing items 401-420 of 1719
-
Group leaders' meeting, March 26, 1952
(MIT Digital Computer Laboratory, 1952-03-27)Minutes of weekly group leader meeting discussing the commencement of weekly group leader meetings, formation of Group 64 and 65, the Division 6 Lincoln Progress Report, security classification of Whirlwind II, time schedules ... -
Group leaders' meeting, April 15, 1952
(MIT Digital Computer Laboratory, 1952-04-14)Minutes of weekly group leader meeting discussing Whittemore space, block diagram meetings, Barta space, Lincoln finance, magnetic drums, and recruiting. -
List of E-series memorandums
(MIT Servomechanisms Laboratory, 2009-06-17)List of Project Whirlwind E-series memorandums, numbering E-1 through E-536. -
List of E-series memorandums
(MIT Servomechanisms Laboratory, 2009-06-17)List of Project Whirlwind E-series memorandums, numbering E-1 through E-258. -
List of M-series memorandums
(MIT Servomechanisms Laboratory, 2009-06-17)List of Project Whirlwind M-series memorandums, numbering M-1 through M-2608. -
Compilation of D Series Memoranda in Division 6 Document Room, Building C-129.
(Lincoln Laboratory - Division 6, 2009-06-17)List of Division 6 Memoranda, numbering 6D-52 through 6D-108. -
List of R-series memorandums
(MIT Servomechanisms Laboratory, 2009-06-17)List of Project Whirlwind R-series memorandums, numbering R-1 through R-222. -
Compilation of R Series Memoranda in Division 6 Document Room, Building C-129.
(Lincoln Laboratory - Division 6, 2009-06-17)List of Project Whirlwind R-series memorandums, numbering R-90 through R-236. -
List of conference notes
(MIT Servomechanisms Laboratory, 2009-06-17)List of Project Whirlwind conference notes, numbering C-1 through C-119. -
Compilation of M Series and E Series Memoranda in Division 6 Document Room, Building C-129.
(Lincoln Laboratory - Division 6, 2009-06-17)List of Division 6 Memoranda, numbering 6M-4163 through 6E-2024. -
Compilation of M Series Memoranda in Division 6 Document Room, Building C-129.
(Lincoln Laboratory - Division 6, 2009-06-17)List of Division 6 Memoranda, numbering 6M-1 through 6M-4162. -
Secret supplement to Biweekly Report for July 16, 1954
(Lincoln Laboratory - Division 6, 1954-07-16)Memorandum detailing a number of new permutation programs written to generate a total of 7000 situations for the F-99 interception simulation program and the design of a standard layout for punching F-99 test results on IBM cards. -
Comments on BTL Report #3 to ARDC: "the ground environment problem in air defense: an appraisal of the Lincoln Transition System"
(Lincoln Laboratory - Division 6, 1954-01-26)In response to the Bell Telephone Laboratories report entitled "The Ground Environment Problem in Air Defense: An Appraisal of the Lincoln Transition System," which called military attention to possible Transition System ... -
Secret supplement to Division 6 Biweekly Report, November 20, 1953
(Lincoln Laboratory - Division 6, 1953-11-20)Memorandum detailing meetings held between Division 6 staff and Westinghouse, Boeing, the Air Force, and Project ADES. Also includes information regarding the program which simulated target interception by F-99 and the ... -
Secret supplement to Biweekly Report for February 12, 1954
(Lincoln Laboratory - Division 6, 1954-02-12)Memorandum detailing a permutation program written to permute the parameters of 6000 tracks to simulate the F-99 interceptor performance. -
Secret supplement to Division 6 Biweekly Report, September 25, 1953
(Lincoln Laboratory - Division 6, 1953-09-25)Memorandum detailing the development of an "M" series note for reporting under Secret classification. Also includes information regarding the use of the Boeing F-99 guided missile (Bomarc) in the Lincoln Transition System. -
Secret supplement to Biweekly Report for March 12, 1954
(Lincoln Laboratory - Division 6, 1954-03-12)Memorandum detailing the results of 600 (out of 6000) tracks run for the F-99 interception-simulation program. -
Bomarc meeting with AFCRC, WADC, and Boeing
(MIT Lincoln Laboratory, 1953-06-23)Minutes of a meeting held on June 15-18, 1953, to discuss the relationship of the Bomarc ground control system to the Transition System, to see whether the performance of the Bomarc system would be adequately provided for ... -
Secret supplement to biweekly report for 5 November 1954.
(Lincoln Laboratory - Division 6, 1954-11-05)Summarizes communications between Division 6 staff and Talos regarding the form of the ground-to-ground output message, the remote receiving equipment required, and a meeting at Lincoln Laboratory on 6 October 1954. -
Transition system for air defense: estimate of cost and delivery for the initial sector
(Lincoln Laboratory - Division 6, 1953-02-18)In Lincoln Laboratory Technical Memorandum No. 20, which describes the proposed Transition System for Air Defense, Section VIII indicates that a study was being made regarding the cost and time factors for an initial sector. ...