Summary report no. 18, March 1949
Project Whirlwind Research Staff

DownloadMC665_r22_sr-18.pdf (2.540Mb)
Date
2009-06-15T22:28:12ZAbstract
In-depth review of Project Whirlwind in March 1949.
Description
Includes: foreword; quarterly review; installation and testing of WWI; control, electrostatic storage control, and in-out control; summary schedule; storage tubes, spots on storage surface and storage tube life tester; vacuum tube life; visitors; appendix, reports and publications. Includes summary table of Whirlwind I schedules.