MIT Libraries logoDome

MIT
View Item 
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Summary report no. 19, second quarter, 1949

Project Whirlwind Research Staff
Thumbnail
DownloadMC665_r22_sr-19.pdf (6.232Mb)
URI
http://hdl.handle.net/1721.3/40706
Date
2009-06-15T22:28:09Z
Abstract
In-depth review of Project Whirlwind in the second quarter of 1949.
Description
Includes: foreword; quarterly review, summary schedule Jan. 1949-Dec. 1949 and summary schedule July 1949-June 1950; system engineering, installation and testing of WWI, system testing the arithmetic element of WWI, constant-frequency restoration and the clock pulse control, and revised orders in the Whirlwind computer; circuits and components, five digit multiplier reliability, life of vacuum tubes in WWI, and list of WWI component failures; electrostatic storage, tube construction, testing, and storage tube circuits; input-output; mathematics and applications, calculation of correlation functions, investigation of the Gauss-Seidel Iterative Method, control systems to operate with the WW computer, and solution of power network problems; appendix, visitors, reports and publications.
 
Includes summary table of Whirlwind I schedules.
 
Metadata
Show full item record

Collections
  • Project Whirlwind Reports

Browse

All of DomeCommunities & CollectionsBy Issue DateCreatorsTitlesSubjectsThis CollectionBy Issue DateCreatorsTitlesSubjects

My Account

Login
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.