MIT Libraries logoDome

MIT
View Item 
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

MIT-IBM maintenance liaison meeting no.1

Watt, C. W.
Thumbnail
DownloadMC665_r16_M-4160.pdf (913.5Kb)
URI
http://hdl.handle.net/1721.3/40669
Date
1956-02-13
Abstract
Meetings between MIT-IBM personnel will be held periodically to discuss equipment troubles. This meeting was the first of the series; tape drive troubles and XD-1 maintenance policy in general were discussed. IBM believes that the practice of cleaning the tape mechanism every 8 hours will markedly reduce tape failures, which caused about 25% of all MIT lost time in January. It was agreed that Group 67 and IBM would work closely to try to determine the exact nature of tape failures. In the future when errors of any sort appear in XD-1 a serious attempt will be made by IBM Maintenance personnel to correct them on the spot rather than wait until routine maintenance periods.
Description
Includes figure of time lost in various areas of XD-1 in Jan 1956.
Metadata
Show full item record

Collections
  • Project Whirlwind Reports

Browse

All of DomeCommunities & CollectionsBy Issue DateCreatorsTitlesSubjectsThis CollectionBy Issue DateCreatorsTitlesSubjects

My Account

Login
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.