dc.contributor.authorCrane, J. D.en_US
dc.contributor.authorThompson, S. L.en_US
dc.date.accessioned2009-06-15T19:36:49Z
dc.date.available2009-06-15T19:36:49Z
dc.date.issued1955-01-25en_US
dc.identifierMC665_r15_M-3326en_US
dc.identifier.urihttp://hdl.handle.net/1721.3/40544
dc.descriptionIncludes: study of log entries; marginal checking data; central computer test run; power shut-down test; and computer test time schedule.en_US
dc.description.abstractFrom 13 February to 28 February 1955, the performance of the central computer was monitored by studying log entries and by carrying out a series of tests on 28 February. Mean good-time and the per cent of assigned time that was unusable was determined by examining the log. Margins and trends in the margins were also determined. The test on 28 February consisted of shock tests and an eight-hour period during which various reliability programs were run.en_US
dc.language.isoenen_US
dc.publisherLincoln Laboratory - Division 6en_US
dc.relation.ispartofseriesDivision 6 Memo M-3326en_US
dc.relation.ispartofseriesProject Whirlwind Collection, MC665en_US
dc.subject.otherpower shut-down testen_US
dc.subject.otherreliability testen_US
dc.subject.othershock testen_US
dc.titleCentral computer evaluation, February 14-28, 1955en_US
dc.typeTechnical Reporten_US