MIT Libraries logoDome

MIT
View Item 
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Central computer evaluation, February 14-28, 1955

Crane, J. D.; Thompson, S. L.
Thumbnail
DownloadMC665_r15_M-3326.pdf (933.6Kb)
URI
http://hdl.handle.net/1721.3/40544
Date
1955-01-25
Abstract
From 13 February to 28 February 1955, the performance of the central computer was monitored by studying log entries and by carrying out a series of tests on 28 February. Mean good-time and the per cent of assigned time that was unusable was determined by examining the log. Margins and trends in the margins were also determined. The test on 28 February consisted of shock tests and an eight-hour period during which various reliability programs were run.
Description
Includes: study of log entries; marginal checking data; central computer test run; power shut-down test; and computer test time schedule.
Metadata
Show full item record

Collections
  • Project Whirlwind Reports

Browse

All of DomeCommunities & CollectionsBy Issue DateCreatorsTitlesSubjectsThis CollectionBy Issue DateCreatorsTitlesSubjects

My Account

Login
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.