Group 62 Section Leaders Meeting-- AN/FSQ-7 Equipment Design Program
Mayer, Rollin P.

DownloadMC665_r06_M-2470.pdf (741.7Kb)
Date
1953-10-13Abstract
Two situations urgently need attention at the present time. The vacuum tube count for a central has become rather large, and every effort should be made to see what can be done to reduce the count. The space required for XD-1 exceeds the space available in the basement of building A, and several alternate arrangements are being investigated. Progress in other fields is fairly satisfactory.