dc.contributor.author | Kromer, A. P. | en_US |
dc.date.accessioned | 2009-05-09T05:07:54Z | |
dc.date.available | 2009-05-09T05:07:54Z | |
dc.date.issued | 2009-05-09T05:07:54Z | |
dc.identifier | MC665_r06_M-2574.pdf | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.3/39441 | |
dc.description.abstract | SDV demodulator circuitry has been reviewed and accepted. Phone line transmission characteristics are being determined in conjunction with Bell Laboratories Project ADES personnel. Simplification of equipment to handle inputs having a relatively slow data rate is under study. Coordination of output system and equipment development is to be done by a joint IBM--Div. 6--Div 2 committee. Formalizing of the release for design completion and for construction of the two prototype systems is to be outlined in M-2575. Operational aspects of the display equipment for both Direction Center and Combat Center are being considered jointly by Lincoln, ADES and ADC. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Lincoln Laboratory - Division 6 | en_US |
dc.relation.ispartofseries | Project Whirlwind Memo M-2574 | en_US |
dc.relation.ispartofseries | Project Whirlwind Collection, MC665 | en_US |
dc.title | Group 62 Section Leaders Meeting -- December 14, 1953 | en_US |
dc.type | Technical Report | en_US |