Now showing items 641-660 of 1719

    • Master reference list of equipment specifications for XD-1 

      Giordano, J. (Lincoln Laboratory - Division 6, 1955-12-21)
      Second supplement to 6M-3851-1, master reference list, dated 11 October 1955, issued by the Systems Office. Includes only concurred changes, revisions, and clarifications to XD-1 specifications.
    • Master reference list of equipment specifications for XD-1 

      Giordano, J. (Lincoln Laboratory - Division 6, 1957-04-26)
      Compilation of all the active technical specification documents which received Lincoln-IBM concurrence for AN/FSQ-7, XD-1 design. The list is a revision of the previous list, 6M-3851-3 and its supplements, and was brought ...
    • Minutes of the IBM-SO concurrence meeting no. 36 held at Lincoln Laboratory 25 August 1955 

      Dodd, S. H.; Taylor, N. H. (Lincoln Laboratory - Division 6, 1955-08-30)
      Minutes of an IBM-SO concurrent meeting discussing test equipment for duplex central; PERSELBSN codes; proposal for revision of 723 punch circuits; second floor layout for Building F; LRI monitor breadboard; console equipment ...
    • Master reference list of equipment specifications for XD-1 

      Giordano, J. (Lincoln Laboratory - Division 6, 1956-03-09)
      Memorandum containing all of the concurred specifications which Lincoln Laboratory recommends for XD-1 design as of 9 March 1956. Supercedes 6M-3851-1, and supplements 1, 2, and 3.
    • SAGE system meeting, February 21, 1955 

      Bragar, P. (Lincoln Laboratory - Division 6, 1955-02-21)
      Minutes of weekly SAGE System meeting discussing IBM maintenance responsibilities in Building F, computer time cycle, programming manpower requirements for system checkout and evaluation, dissemination of information on ...
    • Discussion of Lincoln concurrence on engineering-installation phasing committee, summary report #6 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-03-22)
      Lincoln Laboratory concurrence on the Engineering-Installation Phasing Committee, Summary Report #6 was discussed at a meeting of interested Lincoln Laboratory personnel on 22 March 1955. It was agreed that Lincoln would ...
    • Specifications for the central computer system for the AN/FSQ-7 

      Forrester, Jay W. (Lincoln Laboratory - Division 6, 1955-01-28)
      Memorandum listing the IBM specification documents and Lincoln Laboratory M-notes which describe sections 0-9 of the AN/FSQ-7 Central Computer System. This series of documents was prepared to give the status of specifications ...
    • SAGE System meeting 22 August 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-08-22)
      Minutes of weekly SAGE System meeting discussing 13 September ADES status meeting, command post desk, AN/FSQ-7 (XD-1), C.A.A. liaison, seminar subjects, IBM teletype, and meetings scheduled that week.
    • Laboratory personnel 

      Division 6 Administrative Staff (Lincoln Laboratory - Division 6, 1955-04-01)
      List of Division 6 personnel at Lincoln Laboratory in April 1955.
    • SAGE system meeting, February 28, 1955 

      Bragar, P. (Lincoln Laboratory - Division 6, 1955-02-28)
      Minutes of weekly SAGE System meeting discussing SAGE experimental subsector approval committee meeting, Mark X, computer time cycle, auxiliary memory drum meeting, engineering-installation-phasing committee meeting, and ...
    • Laboratory personnel 

      Division 6 Administrative Staff (Lincoln Laboratory - Division 6, 1955-06-01)
      List of Division 6 personnel at Lincoln Laboratory in June 1955.
    • Laboratory personnel 

      Sainato, Frances. (Lincoln Laboratory - Division 6, 1956-01-01)
      List of Division 6 personnel at Lincoln Laboratory in January 1956.
    • SAGE System meeting 12 December 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-12-12)
      Minutes of weekly SAGE System meeting discussing Group 61 requirements, schedule for test concept memoranda, ESS planning organization, training and battle simulation room, and meetings scheduled that week.
    • SAGE System meeting 5 December 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-12-05)
      Minutes of weekly SAGE System meeting discussing Boeing study plan, Waltham move, ERA visit, XD-1 time allocation, schedules for ADES review, and meetings scheduled that week.
    • Summary of MIT-IBM collaboration - November 1 thru December 31, 1954 

      Kromer, A. P. (Lincoln Laboratory - Division 6, 1955-01-07)
      Summary of the collaboration between MIT and IBM between November 1-December 31, 1954.
    • Minutes of SAGE experimental subsector planning approval committee meeting of 4 April 1955 

      Anderson, H. E. (Lincoln Laboratory - Division 6, 1955-04-11)
      Minutes of a SAGE experimental subsector planning approval committee meeting discussing operational mode for Bath and Brunswick, Maine; ARDC personnel required; weapons; radar orientation; and telephone facility cost.
    • Laboratory personnel 

      Division 6 Administrative Staff (Lincoln Laboratory - Division 6, 1955-11-01)
      List of Division 6 personnel at Lincoln Laboratory in November 1955.
    • SAGE System meeting 6 June 1955 

      Carson, J. J. (Lincoln Laboratory - Division 6, 1955-06-08)
      Minutes of weekly SAGE System meeting discussing status of change procedure, status of IBM installed equipment in Building F, building review, status of lighting, corning glass symposium, RAND permanent facilities site, ...
    • SAGE System meeting, January 17, 1955 

      Proctor, J. C. (Lincoln Laboratory - Division 6, 1955-01-20)
      Minutes of weekly SAGE System meeting discussing exhibit 17, specifications for first production machine, AA proposal, test specifications for XD-1, charactron display, and communication memos.
    • Master reference list of equipment specifications for XD-1 

      Giordano, J.; Buzzard, R. D. (Lincoln Laboratory - Division 6, 1955-09-07)
      List of documents that form the equipment specifications for XD-1.