Project Whirlwind Reports: Recent submissions
Now showing items 581-600 of 1719
-
SAGE System meeting, 12 March 1956
(Lincoln Laboratory - Division 6, 1956-03-12)Minutes of weekly SAGE System meeting discussing new Boeing-Lincoln study, duplex standby specifications, AEW presentation at steering committee meeting, F102A, TALOS, Whirlwind I print-out, and meetings scheduled that week. -
SAGE System meeting, 20 February 1956
(Lincoln Laboratory - Division 6, 1956-02-21)Minutes of weekly SAGE System meeting discussing AN/TSQ-7 output section, report to TAPE on SAGE integration, combat center display slots, subsystems test specifications, and meetings scheduled that week. -
Return of little-used Division 6 test equipment; 48 hour loans
(Lincoln Laboratory - Division 6, 1956-02-24)Memo asking Division 6 staff to return any seldom-used equipment to the Test Equipment Headquarters and stating that in-demand equipment would be loaned for only 48-hour periods. -
Personnel list
(Lincoln Laboratory - Division 6, 1956-07-01)List of Division 6 personnel at Lincoln Laboratory in 1956. -
Minutes of the IBM-DCO Concurrence meeting no.56 held at Lincoln Laboratory 15 March 1956
(Lincoln Laboratory - Division 6, 1956-03-16)Minutes of the IBM-DCO Concurrence meeting no.56 held at Lincoln Laboratory discussing the XD-1, XD-2 crosstelling; DC-CC input switching; D-32-4; D-35-3; S-30; alternate writing surface for CP DD desks; normal area ... -
Minutes of the IBM-DCO Concurrence meeting no.62 held at Lincoln Laboratory 27 May 1956
(Lincoln Laboratory - Division 6, 1956-05-29)Correction of Division 6 Memo M-4348, noting that the title should read "17 May 1956." -
SAGE System meeting, 28 May 1956
(Lincoln Laboratory - Division 6, 1956-05-28)Minutes of weekly SAGE System meeting discussing Western Electric representative at McGuire, F102 meeting, BOMARC integration, telephone in building F, TV link to Fort Dawes, program preparation for McGuire, and IBM-Lincoln ... -
Magnetization reversal in thin films
(Lincoln Laboratory - Division 6, 1956-06-04)The magnetization reversal of thin films (1000 A thick) of 80-20 Permalloy has been studied in a strip transmission line. These films are evaporated onto a heated glass substrate in the presence of an orienting field. ... -
XD-1 system operation and results of system tests from 3 December 1955 through 10 March 1956
(Lincoln Laboratory - Division 6, 1956-03-28)The reliability of the XD-1 system has in general improved since the last report was issued (Memo 6M-4100 covering November, 1955). Overall reliability - up from 89% in December to 95% in February. Mean-good time between ... -
SAGE System meeting, 21 May 1956
(Lincoln Laboratory - Division 6, 1956-05-21)Minutes of weekly SAGE System meeting discussing improved GFI mapper, dictionary of SAGE terms, SAGE study group, status and failure reporting, and BOMARC operational plan. -
Sage System meeting, 30 January 1956
(Lincoln Laboratory - Division 6, 1956-01-30)Minutes of weekly Sage System meeting discussing MTC tape units, convention travel, Rand STP program, phone line error rate, production tape machines, MTC modifications, and test concept memoranda. -
Minutes of the IBM-DCO Concurrence meeting no.62 held at Lincoln Laboratory 27 May 1956
(Lincoln Laboratory - Division 6, 1956-05-21)Minutes of the IBM-DCO Concurrence meeting no.62 held at Lincoln Laboratory discussing duplex , prototype, and previous minutes. -
SAGE System meeting, 14 May 1956
(Lincoln Laboratory - Division 6, 1956-05-14)Minutes of weekly SAGE System meeting discussing computer time, building work after B.O.D., ADC meetings on weapons integration, access to SAGE sites, memory expansion, and 026 for Group 61. -
Group organization list
(Lincoln Laboratory - Division 6, 1956-02-01)Full listing of all Division 6 personnel by groups and subsections. -
SAGE System meeting, 26 March 1956
(Lincoln Laboratory - Division 6, 1956-03-26)Minutes of weekly SAGE System meeting discussing TRACALS, air staff meeting in Washington, and meetings scheduled that week. -
Minutes of the IBM-DCO Concurrence meeting no.58 held at Lincoln Laboratory 5 April 1956
(Lincoln Laboratory - Division 6, 1956-04-09)Minutes of the IBM-DCO Concurrence meeting no.58 held at Lincoln Laboratory discussing P-265, D-32-4, and light gun simulators. -
The noise problem in the coincident-current memory matrix
(Lincoln Laboratory - Division 6, 1956-02-13)Magnetic ferrites which have square hysteresis loops are being used as memory elements in high-speed digital computers. The limiting factor in memory reliability is the noise generated by the magnetic cores which are ... -
Personnel list
(Lincoln Laboratory - Division 6, 1956-06-01)List of Division 6 personnel at Lincoln Laboratory in 1956. -
SAGE System meeting, 23 April 1956
(Lincoln Laboratory - Division 6, 1956-04-23)Minutes of weekly SAGE System meeting discussing Boeing study, Volscan, and delivery of consoles for McGuire. -
Sage System meeting, 16 January 1956
(Lincoln Laboratory - Division 6, 1956-01-16)Minutes of weekly Sage System meeting discussing IBM-Lincoln coordination meeting of 12 January 1956, January ADES status meeting, training, Boeing-Lincoln Committee, Talos meeting, light costs in direction center, and ...