Search
Now showing items 1-10 of 1392
Group leaders' meeting - April 2, 1956
(Lincoln Laboratory - Division 6, 1956-04-25)
Minutes of weekly group leader meeting discussing salary review, BTL supervision of EPSCOM, resignation of Watt, resignation of Alperin and McCusker, WWI time, promotion problem, Group 61 moving staff to Lexington, AEW, ...
List of Slides, 35mm. Slides, and Vu-Graphs
(Lincoln Laboratory - Division 6, 1957-12-31)
The slides and Vu-graphs listed here are available on a loan basis from the Division 7 Document Room subject to security regulations. The Document Room has a card file of positive prints of these slides for ready reference.
Summary of Lincoln Laboratory Technical Information Releases Pertaining To The Sage System Issued By The Production Coordination Office (Cumulative List Through 31 March 1956)
(Lincoln Laboratory - Division 6, 1955-04-09)
The summary is a catalogued listing of Technical Information Releases pertaining to the Sage System that have been issued to date and indicates present status. The Production Coordination Office is an office established ...
Laboratory Personnel
(MIT Digital Computer Laboratory, 1951-10-01)
Roster of staff and non-staff laboratory personnel.
Group leaders' meeting - September 26, 1955
(Lincoln Laboratory - Division 6, 1955-09-29)
Minutes of weekly group leader meeting discussing visit to IBM research laboratory, Building 10 program, preliminary meeting of Lincoln Committee A, M notes, space - Murphy Hospital, IBM space, Group 61 programmers, display ...
Master reference list of equipment specifications for XD-1
(Lincoln Laboratory - Division 6, 1956-02-07)
Third supplement to 6M-3851-1, master reference list, dated 11 October 1955, issued by the design control section. Includes only concurred changes, revisions, and clarifications to XD-1.
Bi-weekly Report, Project 6782, July 21, 1950
(MIT Servomechanisms Laboratory - ECD, 1950-07-21)
Bi-weekly progress report of Electronic Computer Division research teams on Navy Fire Control.
SAGE System meeting, 5 March 1956
(Lincoln Laboratory - Division 6, 1956-03-05)
Minutes of weekly SAGE System meeting discussing results of ESS Data Circuit Compatibility Meeting, test concept memoranda, AEW with SAGE, SAGE Bomarc meeting results, McGuire installation planning, F102A, and meeting ...
Laboratory personnel
(Lincoln Laboratory - Division 6, 1955-07-01)
List of Division 6 personnel at Lincoln Laboratory in July 1955.
SAGE System meeting 21 November 1955
(Lincoln Laboratory - Division 6, 1955-11-21)
Minutes of weekly SAGE System meeting discussing training tapes, SAGE system meeting, engineering-installation phasing committee, tape equipment for MTC, and meetings scheduled that week.