Search
Now showing items 1-10 of 128
Group leaders' meeting - April 2, 1956
(Lincoln Laboratory - Division 6, 1956-04-25)
Minutes of weekly group leader meeting discussing salary review, BTL supervision of EPSCOM, resignation of Watt, resignation of Alperin and McCusker, WWI time, promotion problem, Group 61 moving staff to Lexington, AEW, ...
Master reference list of equipment specifications for XD-1
(Lincoln Laboratory - Division 6, 1956-02-07)
Third supplement to 6M-3851-1, master reference list, dated 11 October 1955, issued by the design control section. Includes only concurred changes, revisions, and clarifications to XD-1.
SAGE System meeting, 5 March 1956
(Lincoln Laboratory - Division 6, 1956-03-05)
Minutes of weekly SAGE System meeting discussing results of ESS Data Circuit Compatibility Meeting, test concept memoranda, AEW with SAGE, SAGE Bomarc meeting results, McGuire installation planning, F102A, and meeting ...
SAGE System meeting, 27 February 1956
(Lincoln Laboratory - Division 6, 1956-02-27)
Minutes of weekly SAGE System meeting discussing phone circuit error rates, distribution of weapons integration memorandum, results of Murphy space meeting, ESS presentation at next ADES meeting, ESS changes, height finder ...
Group organization list
(Lincoln Laboratory - Division 6, 1956-02-01)
Full listing of all Division 6 personnel by groups and subsections.
SAGE System meeting, 20 February 1956
(Lincoln Laboratory - Division 6, 1956-02-21)
Minutes of weekly SAGE System meeting discussing AN/TSQ-7 output section, report to TAPE on SAGE integration, combat center display slots, subsystems test specifications, and meetings scheduled that week.
Biweekly Report for Period Ending 1 June 1956
(Lincoln Laboratory - Division 6, 1956-06-11)
Bi-weekly progress report of Division 6 research teams.
Memory core heating by switching at high frequencies
(Lincoln Laboratory - Division 6, 1956-01-31)
The heating of a memory core caused by high frequency
switching has been studied experimentally. For a
switching frequency of 4OO kilocycles (the maximum frequency possible in a coincident-current two-to-one
selection ...
Biweekly Report for Period Ending 29 June 1956
(Lincoln Laboratory - Division 6, 1956-07-05)
Bi-weekly progress report of Division 6 research teams.
SAGE System meeting, 18 June 1956
(Lincoln Laboratory - Division 6, 1956-06-18)
Minutes of weekly SAGE System meeting discussing D. C. Building redesign, schedule readjustments, XD-1 reliability, and radar orientation.