Search
Now showing items 1-10 of 10
Proposed XD-1 evaluation, 13 July 1955
(Lincoln Laboratory - Division 6, 1955-06-28)
The addressable fields of the magnetic drums (CD side),
the central computer, and the drum entry portion of manual inputs were included in the fourth XD-1 evaluation. This evaluation included shock tests, an eight-hour ...
Results of the system tests performed on AN/FSQ-7 (XD-1) during October 1955
(Lincoln Laboratory - Division 6, 1955-12-02)
Results of system tests performed on the display system and the GFI element in XD-1 during October 1955.
XD-1 evaluation, 13 July 1955
(Lincoln Laboratory - Division 6, 1955-09-12)
Second evaluation of the CD addressable drums performed on 13 July 1955.
Results of the system tests (phases V and VI) on the AN/FSQ-7 (XD-1) during November 1955.
(Lincoln Laboratory - Division 6, 1955-01-11)
Results of system tests performed on the LRI element and the crosstell element during the month of November 1955.
XD-1 evaluation, 20 May 1955
(Lincoln Laboratory - Division 6, 1955-06-08)
The CD side of the drums was systems tested and was
now part of the XD-1. However, as anticipated by the drum system engineers, the drums performed very poorly during the evaluation tests. The percentage of usable assigned ...
Results of the system test performed on the AN/FSQ-7 (XD-1) during June 1955
(Lincoln Laboratory - Division 6, 1955-08-25)
Memorandum disseminating the results of a system test performed on the central computer portion of the AN/FSQ-7 during the month of June 1955.
Results of the XD-1 central computer evaluation, 18 March 1955
(Lincoln Laboratory - Division 6, 1955-03-28)
Discussion of the results of the second in a series of evaluations performed on the XD-1 Central Computer. For this evaluation, log book data and daily operation reports which covered the period 7-18 March 1955 were studied ...
Central computer evaluation, February 14-28, 1955
(Lincoln Laboratory - Division 6, 1955-01-25)
From 13 February to 28 February 1955, the performance of the central computer was monitored by studying log entries and by carrying out a series of tests on 28 February. Mean good-time and the per cent of assigned time ...
Results of the system test (phase II) performed on the AN/FSQ-7 (XD-1) during July, August, and September 1955
(Lincoln Laboratory - Division 6, 1955-11-01)
Results of a system test performed on the magnetic tapes and fifteen addressable drum fields.
Evaluation tests on the XD-1 central computer
(Lincoln Laboratory - Division 6, 1955-01-21)
Memorandum discussing the evaluation of XD-1 by a series of tests made over a period of a few weeks ending March 1, 1955. Existing XD-1 reliability programs were used during most phases of test. Machine operation was baaed ...