Results of the system test (phase II) performed on the AN/FSQ-7 (XD-1) during July, August, and September 1955
Crane, J. D.
DownloadMC665_r15_M-3940.pdf (1.393Mb)
Date
1955-11-01Abstract
Results of a system test performed on the magnetic tapes and fifteen addressable drum fields.
Description
Includes: introduction; equipment and logical functions submitted for acceptance; results of acceptance test demonstration; XD-1 performance during July, August, and September 1955; margins and margin history; summary; table; and diagrams.