Browsing Project Whirlwind Reports by Title
Now showing items 1386-1405 of 1719
-
Results of the system test (phase II) performed on the AN/FSQ-7 (XD-1) during July, August, and September 1955
(Lincoln Laboratory - Division 6, 1955-11-01)Results of a system test performed on the magnetic tapes and fifteen addressable drum fields. -
Results of the system test performed on the AN/FSQ-7 (XD-1) during June 1955
(Lincoln Laboratory - Division 6, 1955-08-25)Memorandum disseminating the results of a system test performed on the central computer portion of the AN/FSQ-7 during the month of June 1955. -
Results of the system tests (phases V and VI) on the AN/FSQ-7 (XD-1) during November 1955.
(Lincoln Laboratory - Division 6, 1955-01-11)Results of system tests performed on the LRI element and the crosstell element during the month of November 1955. -
Results of the system tests performed on AN/FSQ-7 (XD-1) during October 1955
(Lincoln Laboratory - Division 6, 1955-12-02)Results of system tests performed on the display system and the GFI element in XD-1 during October 1955. -
Results of the XD-1 central computer evaluation, 18 March 1955
(Lincoln Laboratory - Division 6, 1955-03-28)Discussion of the results of the second in a series of evaluations performed on the XD-1 Central Computer. For this evaluation, log book data and daily operation reports which covered the period 7-18 March 1955 were studied ... -
Return of little-used Division 6 test equipment; 48 hour loans
(Lincoln Laboratory - Division 6, 1956-02-24)Memo asking Division 6 staff to return any seldom-used equipment to the Test Equipment Headquarters and stating that in-demand equipment would be loaned for only 48-hour periods. -
An RF Readout System for a Coincident-Current Magnetic-Core Memory
(MIT Department of Electrical Engineering, 1952-12-19)Master's Thesis Research Proposal on an RF Readout System for a Coincident-Current Magnetic-Core Memory. It is the purpose of this thesis to evaluate the utility of the proposed system of high-frequency nondestructive ... -
Rough notes on systems planning meeting on 7 February 1955 at 0930E
(Lincoln Laboratory - Division 6, 1955-02-07)Minutes of a systems planning meeting discussing initial specifications; status of auxiliary memory; plans and schedules; list of committee members; proposed format of M notes; and prime power. -
Rudiments of Good Circuit Design
(MIT Digital Computer Laboratory, 1953-05-19)Circuits which depend on the absolute stability and reproducibility of components have proved to be unreliable and often impractical for field use. A study of tolerances of a circuit to its component variations, when made ... -
Rudiments of Good Circuit Design
(MIT Digital Computer Laboratory, 1952-12-22)Circuits which depend on the absolute stability and reproducibility of components have proved to be unreliable and often impractical for field use. A study of the tolerances of a circuit to its component variations, when ... -
SAGE System meeting 1 August 1955
(Lincoln Laboratory - Division 6, 1955-08-01)Minutes of weekly SAGE System meeting discussing display system, study - 700 series IBM machines, card preparation room, schedules for operational and mathematical specifications, industrial management study, and meetings ... -
SAGE System meeting 10 October 1955
(Lincoln Laboratory - Division 6, 1955-10-10)Minutes of weekly SAGE System meeting discussing survey of Division 6 staff manpower requirements, Group 61 requirements, document distribution, Bendix meeting, ADES list of items requiring action, tape conversion equipment, ... -
SAGE System meeting 11 April 1955
(Lincoln Laboratory - Division 6, 1955-04-11)Minutes of weekly SAGE System meeting discussing joint services advisory committee, programming meeting, coordination meeting, display meeting, computer time on MTC, Division 6 participation in radar study, acceptance tests ... -
SAGE System meeting 12 December 1955
(Lincoln Laboratory - Division 6, 1955-12-12)Minutes of weekly SAGE System meeting discussing Group 61 requirements, schedule for test concept memoranda, ESS planning organization, training and battle simulation room, and meetings scheduled that week. -
SAGE System meeting 14 November 1955
(Lincoln Laboratory - Division 6, 1955-11-14)Minutes of weekly SAGE System meeting discussing ready room for Building F, Bomarc visit, ECP processing, meeting on test planning activity, XD-1 time, personnel to augment Section C, and meetings scheduled that week. -
SAGE System meeting 15 August 1955
(Lincoln Laboratory - Division 6, 1955-08-15)Minutes of weekly SAGE System meeting discussing fatigue tests at consoles, FST-2 schedules, index registers for XD-1, display system status, XD-1 contract for the coming year, auxiliary drums for XD-1, external environment ... -
SAGE System meeting 17 October 1955
(Lincoln Laboratory - Division 6, 1955-10-17)Minutes of weekly SAGE System meeting discussing Division 6 staff manpower requirements, Group 61 requirements, SAGE systems test, and meetings scheduled that week. -
SAGE System meeting 18 April 1955
(Lincoln Laboratory - Division 6, 1955-04-18)Minutes of weekly SAGE System meeting discussing Taylor's trip to Willow Run Research Center, ADES monthly status meeting, communications between the First Direction Center and P-sites, lighting in Building "F," operational ... -
SAGE System meeting 18 July 1955
(Lincoln Laboratory - Division 6, 1955-07-18)Minutes of weekly SAGE System meeting discussing meeting with AMC at Dayton, comments on minimum equipment list for AN/FSQ-7, communications entrance facilities in experimental subsector, visit to Philco and Burroughs, ... -
SAGE System meeting 19 December 1955
(Lincoln Laboratory - Division 6, 1955-12-19)Minutes of weekly SAGE System meeting discussing proposed IBM building, Group 61 space, systems maintenance programs, results of Air Force phasing meeting, Boeing-Lincoln study group progress, visit to ERA, and meetings ...