Now showing items 1386-1405 of 1719

    • Results of the system test (phase II) performed on the AN/FSQ-7 (XD-1) during July, August, and September 1955 

      Crane, J. D. (Lincoln Laboratory - Division 6, 1955-11-01)
      Results of a system test performed on the magnetic tapes and fifteen addressable drum fields.
    • Results of the system test performed on the AN/FSQ-7 (XD-1) during June 1955 

      Crane, J. D. (Lincoln Laboratory - Division 6, 1955-08-25)
      Memorandum disseminating the results of a system test performed on the central computer portion of the AN/FSQ-7 during the month of June 1955.
    • Results of the system tests (phases V and VI) on the AN/FSQ-7 (XD-1) during November 1955. 

      Crane, J. D. (Lincoln Laboratory - Division 6, 1955-01-11)
      Results of system tests performed on the LRI element and the crosstell element during the month of November 1955.
    • Results of the system tests performed on AN/FSQ-7 (XD-1) during October 1955 

      Crane, J. D. (Lincoln Laboratory - Division 6, 1955-12-02)
      Results of system tests performed on the display system and the GFI element in XD-1 during October 1955.
    • Results of the XD-1 central computer evaluation, 18 March 1955 

      Crane, J. D.; Thompson, S. L. (Lincoln Laboratory - Division 6, 1955-03-28)
      Discussion of the results of the second in a series of evaluations performed on the XD-1 Central Computer. For this evaluation, log book data and daily operation reports which covered the period 7-18 March 1955 were studied ...
    • Return of little-used Division 6 test equipment; 48 hour loans 

      Test Equipment Committee; Sutro, Louis. (Lincoln Laboratory - Division 6, 1956-02-24)
      Memo asking Division 6 staff to return any seldom-used equipment to the Test Equipment Headquarters and stating that in-demand equipment would be loaned for only 48-hour periods.
    • An RF Readout System for a Coincident-Current Magnetic-Core Memory 

      Widrowitz, Bernard (MIT Department of Electrical Engineering, 1952-12-19)
      Master's Thesis Research Proposal on an RF Readout System for a Coincident-Current Magnetic-Core Memory. It is the purpose of this thesis to evaluate the utility of the proposed system of high-frequency nondestructive ...
    • Rough notes on systems planning meeting on 7 February 1955 at 0930E 

      Mazza, J. V. (Lincoln Laboratory - Division 6, 1955-02-07)
      Minutes of a systems planning meeting discussing initial specifications; status of auxiliary memory; plans and schedules; list of committee members; proposed format of M notes; and prime power.
    • Rudiments of Good Circuit Design 

      Taylor, N. H. (MIT Digital Computer Laboratory, 1953-05-19)
      Circuits which depend on the absolute stability and reproducibility of components have proved to be unreliable and often impractical for field use. A study of tolerances of a circuit to its component variations, when made ...
    • Rudiments of Good Circuit Design 

      Taylor, Norman H. (MIT Digital Computer Laboratory, 1952-12-22)
      Circuits which depend on the absolute stability and reproducibility of components have proved to be unreliable and often impractical for field use. A study of the tolerances of a circuit to its component variations, when ...
    • SAGE System meeting 1 August 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-08-01)
      Minutes of weekly SAGE System meeting discussing display system, study - 700 series IBM machines, card preparation room, schedules for operational and mathematical specifications, industrial management study, and meetings ...
    • SAGE System meeting 10 October 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-10-10)
      Minutes of weekly SAGE System meeting discussing survey of Division 6 staff manpower requirements, Group 61 requirements, document distribution, Bendix meeting, ADES list of items requiring action, tape conversion equipment, ...
    • SAGE System meeting 11 April 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-04-11)
      Minutes of weekly SAGE System meeting discussing joint services advisory committee, programming meeting, coordination meeting, display meeting, computer time on MTC, Division 6 participation in radar study, acceptance tests ...
    • SAGE System meeting 12 December 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-12-12)
      Minutes of weekly SAGE System meeting discussing Group 61 requirements, schedule for test concept memoranda, ESS planning organization, training and battle simulation room, and meetings scheduled that week.
    • SAGE System meeting 14 November 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-11-14)
      Minutes of weekly SAGE System meeting discussing ready room for Building F, Bomarc visit, ECP processing, meeting on test planning activity, XD-1 time, personnel to augment Section C, and meetings scheduled that week.
    • SAGE System meeting 15 August 1955 

      Carson, J. J. (Lincoln Laboratory - Division 6, 1955-08-15)
      Minutes of weekly SAGE System meeting discussing fatigue tests at consoles, FST-2 schedules, index registers for XD-1, display system status, XD-1 contract for the coming year, auxiliary drums for XD-1, external environment ...
    • SAGE System meeting 17 October 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-10-17)
      Minutes of weekly SAGE System meeting discussing Division 6 staff manpower requirements, Group 61 requirements, SAGE systems test, and meetings scheduled that week.
    • SAGE System meeting 18 April 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-04-18)
      Minutes of weekly SAGE System meeting discussing Taylor's trip to Willow Run Research Center, ADES monthly status meeting, communications between the First Direction Center and P-sites, lighting in Building "F," operational ...
    • SAGE System meeting 18 July 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-07-18)
      Minutes of weekly SAGE System meeting discussing meeting with AMC at Dayton, comments on minimum equipment list for AN/FSQ-7, communications entrance facilities in experimental subsector, visit to Philco and Burroughs, ...
    • SAGE System meeting 19 December 1955 

      Lundberg, E. D. (Lincoln Laboratory - Division 6, 1955-12-19)
      Minutes of weekly SAGE System meeting discussing proposed IBM building, Group 61 space, systems maintenance programs, results of Air Force phasing meeting, Boeing-Lincoln study group progress, visit to ERA, and meetings ...