Search
Now showing items 21-30 of 81
Section Leader Minutes - Meeting of June 5, 1954
(Lincoln Laboratory - Division 6, 1954-06-08)
The Air Force is establishing a Joint Progress Office -- JPO -- to coordinate administrative activity for the Transition System Program. Col. R. Osgood will be chairman. The Lincoln Production Coordination Office has been ...
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1), Combat Information Central -- December 1 thru December 31, 1953
(Lincoln Laboratory - Division 6, 1954-01-08)
Collaboration between Lincoln and IBM engineering groups has continued on all phases of development and planning for the program. Some design specifications were formally approved and released to IBM by Lincoln.
Group 62 Section Leaders Meeting 25 January 1954
(Lincoln Laboratory - Division 6, 2009-06-12)
Decision on the display system and basic circuits for the instruction control frame were reached during the week. A revised basis for release of design and constructions by IBM in advance of Lincoln approval has been ...
Group 62 Section Leaders Meeting--April 5, 1954
(Lincoln Laboratory - Division 6, 1954-04-06)
IBM will furnish monthly status reports relative to time schedules. MTC will move about June 1 and be operative again about July 15. An initial proposal on the duplex central will be distributed about May 1. A separate ...
Conference regarding proposed modification to delivery schedule for AN/FSQ-7 duplex centrals - June 9 and 10, 1954
(Lincoln Laboratory - Division 6, 1954-06-11)
Proceedings of a conference called by the AMC Joint Progress Office to discuss the proposed modification to the delivery schedule for AN/FSQ-7 duplex centrals. The agenda surrounded the following topics: field trials for ...
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, March 1 thru March 31, 1954
(Lincoln Laboratory - Division 6, 1954-04-08)
The Typotron tube was selected for Digital Information Display units. Engineering development work is continuing and has led to the approval by Lincoln of the specification for a number of portions of the system. Planning ...
Visits to IBM
(Lincoln Laboratory - Division 6, 2009-06-12)
Memorandum on procedures for advance notification of visits to IBM.
Summary of IBM - MIT Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, June 1 thru June 30, 1954
(Lincoln Laboratory - Division 6, 1954-07-13)
The tempo of engineering activity has increased and resulted in an increase in the amount of travel between the two engineering locations. Lincoln approval of additional portions of the system has been issued.
Group 62 Section Leaders Meeting--August 23, 1954
(Lincoln Laboratory - Division 6, 1954-08-26)
Concurrence with IBM is scheduled for display system and MRI specifications. MTC has been reassembled and will be fully operational by September 1. Components of the 13 most frequently used circuits are to be released for ...
Group 62 Section Leaders Meeting -- March 1, 1954
(Lincoln Laboratory - Division 6, 1954-03-02)
Test of IBM mapper with WWI have been completed. An enlarged display section will handle development of display generation and selection frames. IBM will subsequently construct these units. Planning for tests of XD-1 at ...