Search
Now showing items 1721-1730 of 1737
Biweekly Report, September 25, 1953
(Lincoln Laboratory - Division 6, 1953-09-25)
Bi-weekly progress report of Division 6 research teams.
Bi-weekly Report, April 28, 1950
(MIT Servomechanisms Laboratory - ATCP, 1950-04-28)
Bi-weekly progress report of the Air Traffic Control Project team.
Rectangular Hysteresis Loop Materials in a Non-Destructive Read System
(MIT Department of Electrical Engineering, 1952-10-20)
Master's Thesis Research proposal on Rectangular Hysteresis Loop Materials in a Non-Destructive Read System.
RCA Selectron Storage Tube
(MIT Servomechanisms Laboratory, 1946-06-18)
Abstract of an engineering report on the RCA Selectron Storage Tube.
Group leaders' meeting, July 20, 1953
(MIT Digital Computer Laboratory, 1953-07-21)
Minutes of weekly group leader meeting discussing computer demonstration on July 21, Barta Building telephone system, talk by Forrester for non-staff, and ADC Program.
Laboratory Personnel
(MIT Digital Computer Laboratory, 1953-09-01)
Memorandum listing Laboratory Personnel of the MIT Digital Computer Laboratory.
Bi-weekly Report, July 3, 1952
(MIT Digital Computer Laboratory, 1952-07-03)
Bi-weekly progress report of Digital Computer Laboratory research teams.
Group 63 Seminar on Magnetism VI
(MIT Digital Computer Laboratory, 1952-10-27)
This memo is a summary of a Group 63 seminar on magnetism. Topics include Langevin's theory of paramagnetism, the Curie-Weiss Law, and exchange interactions.
Biweekly Report, January 2, 1953
(MIT Digital Computer Laboratory, 1953-01-02)
Bi-weekly progress report of Digital Computer Laboratory research teams.
Hysteresis Loop Characteristics of MF-1118 for Different Temperatures
(MIT Digital Computer Laboratory, 1952-10-16)
The hysteresis loops were obtained in a temperature range from -196 degrees Centigrade to +305 degrees Centigrade. The Curie point of MF-1118 was reached at approximately 305 degrees Centigrade, and the maximum Squareness ...