Search
Now showing items 1-2 of 2
Results of the system tests (phases V and VI) on the AN/FSQ-7 (XD-1) during November 1955.
(Lincoln Laboratory - Division 6, 1955-01-11)
Results of system tests performed on the LRI element and the crosstell element during the month of November 1955.
Results of the system test (phase II) performed on the AN/FSQ-7 (XD-1) during July, August, and September 1955
(Lincoln Laboratory - Division 6, 1955-11-01)
Results of a system test performed on the magnetic tapes and fifteen addressable drum fields.