Biweekly Progress Report for AN/FSQ-7
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-10-02)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-09-18)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7 (XD-1)
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-07-24)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7 (XD-1), August 21, 1953
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-08-21)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7 (XD-1), August 7, 1953
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-08-07)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7 (XD-1), September 4, 1953
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-09-04)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7, December 18, 1953
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-12-18)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7, December 4, 1953
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-12-04)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7, November 20, 1953
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-11-20)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7, November 6, 1953
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-11-06)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Biweekly Progress Report for AN/FSQ-7, October 23, 1953
Kromer, A. P.; Gray, P. J. (Lincoln Laboratory - Division 6, 1953-10-23)Bi-weekly progress report of the Group 62 Scheduling Office on the AN/FSQ-7 equipment. -
Conference regarding proposed modification to delivery schedule for AN/FSQ-7 duplex centrals - June 9 and 10, 1954
Kromer, A. P. (Lincoln Laboratory - Division 6, 1954-06-11)Proceedings of a conference called by the AMC Joint Progress Office to discuss the proposed modification to the delivery schedule for AN/FSQ-7 duplex centrals. The agenda surrounded the following topics: field trials for ... -
Design and Construction Schedule, WWII Prototype
Kromer, A. P.; Mayer, Rollin P.; Taylor, Norman H. (MIT Digital Computer Laboratory, 1952-12-11)The present schedule for the development of the first prototype model of WWII calls for the urgent decisions concerning specifications and block diagrams to be made early in 1953 so that time will be available to procure, ... -
Discussion with IBM regarding estimate of cost for initial sector, Lincoln Transition Air Defense System
Kromer, A. P. (MIT Digital Computer Laboratory, 1953-03-20)Minutes of meeting with IBM Corporation representatives to discuss estimate of the cost of manufacture of equipment for an initial sector of the Lincoln Transition Air Defense System, IBM's estimated delivery interval, ... -
Division 6 production coordination office
Kromer, A. P. (Lincoln Laboratory - Division 6, 1955-02-10)Memorandum asking Division 6 staff to keep the Production Coordination Office informed regarding all work being done and that copies of all correspondence, conference minutes, etc. be directed to the PCO. -
Field of Work
Kromer, A. P. (MIT Digital Computer Laboratory, 1953-03-09)Memorandum on the current assignment of personnel at MIT and IBM in the various fields of development for the Whirlwind II program. -
Group 62 Section Leaders Meeting 25 January 1954
Kromer, A. P. (Lincoln Laboratory - Division 6, 2009-06-12)Decision on the display system and basic circuits for the instruction control frame were reached during the week. A revised basis for release of design and constructions by IBM in advance of Lincoln approval has been ... -
Group 62 Section Leaders Meeting - 8 February 1954
Kromer, A. P. (Lincoln Laboratory - Division 6, 2009-06-12)Consideration is being given to have MIT provide assistance to IBM with engineering development of specific items of the system. Decision on the switching system for drum circuits has been postponed. An engineering model ... -
Group 62 Section Leaders Meeting - February 15, 1954
Kromer, A. P. (Lincoln Laboratory - Division 6, 1954-02-16)Arrangements to have prime responsibility for certain engineering work placed with MIT have been made in the interest of insuring adherence to July '55 date for system operation. Regular air transportation between Poughkeepsie ... -
Group 62 Section Leaders Meeting - October 26, 1953, AN/FSQ-7 Equipment Design Program
Kromer, A. P. (Lincoln Laboratory - Division 6, 2009-05-09)The 4 digit arithmetic element will be rebuilt by Project High. Study of drums to permit savings in the number of vacuum tubes is underway. The Charactron display tube will be demonstrated later in the week.