Abstract:
Minutes of meeting with IBM Corporation representatives to discuss estimate of the cost of manufacture of equipment for an initial sector of the Lincoln Transition Air Defense System, IBM's estimated delivery interval, and the cost of setting up and equipping a plant in which the manufacturing would be carried out.