AN/FSQ-7 (XD-1) prototype schedule and installation
Forrester, Jay W.

DownloadMC665_r28_L-142.pdf (678.5Kb)
Date
1954-02-26Abstract
Summary of the status of the XD-1 program, responsibilities assumed by Division 6, finances, assistance from other Lincoln divisions, and Building F urgency.