MIT Libraries logoDome

MIT
View Item 
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

XD-1 evaluation, 20 May 1955

Crane, J. D.; Thompson, S. L.
Thumbnail
DownloadMC665_r15_M-3669.pdf (1.762Mb)
URI
http://hdl.handle.net/1721.3/40528
Date
1955-06-08
Abstract
The CD side of the drums was systems tested and was now part of the XD-1. However, as anticipated by the drum system engineers, the drums performed very poorly during the evaluation tests. The percentage of usable assigned time was 73% during the time assigned to MIT and 74.5% for the time during which IBM was running reliability programs and utility programs. Most of the low margins found during the last evaluation were improved. In general, the reliability of the central computer had improved slightly since the last evaluation made.
Description
Includes: physical and logical state of XD-1; reliability; log book data; log book analysis table; XD-1 failures table; MIT's assigned time on XD-1 table; evaluation test; computer evaluation test table; reliability analysis; margins and margin history; table of exceptions; shock tests; and conclusions.
Metadata
Show full item record

Collections
  • Project Whirlwind Reports

Browse

All of DomeCommunities & CollectionsBy Issue DateCreatorsTitlesSubjectsThis CollectionBy Issue DateCreatorsTitlesSubjects

My Account

Login
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.