Section Leader Meeting Group 62, June 14, 1954
Kromer, A. P.
DownloadMC665_r13_M-2875.pdf (852.8Kb)
Date
1954-06-17Abstract
Plans to establish engineering control of inspection and test of prototype system have been initiated. MRI design by IBM is delayed pending a Lincoln decision regarding method of relaying information from P site to Direction Center. Initial hardware for the central display system is being constructed at Division 7, Lexington. Modification to the logic for the radar drum field is to be made to convert the parity bit to an information bit. Provisions to cool XD-1 by use of outside air in emergency are to be incorporated in the system.