MIT Libraries logoDome

MIT
View Item 
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
  • Dome Home
  • Project Whirlwind
  • Project Whirlwind Reports
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Section Leader Meeting Group 62, June 14, 1954

Kromer, A. P.
Thumbnail
DownloadMC665_r13_M-2875.pdf (852.8Kb)
URI
http://hdl.handle.net/1721.3/40360
Date
1954-06-17
Abstract
Plans to establish engineering control of inspection and test of prototype system have been initiated. MRI design by IBM is delayed pending a Lincoln decision regarding method of relaying information from P site to Direction Center. Initial hardware for the central display system is being constructed at Division 7, Lexington. Modification to the logic for the radar drum field is to be made to convert the parity bit to an information bit. Provisions to cool XD-1 by use of outside air in emergency are to be incorporated in the system.
Metadata
Show full item record

Collections
  • Project Whirlwind Reports

Browse

All of DomeCommunities & CollectionsBy Issue DateCreatorsTitlesSubjectsThis CollectionBy Issue DateCreatorsTitlesSubjects

My Account

Login
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.