Group 62 Section Leaders Meeting--August 23, 1954
Kromer, A. P.

DownloadMC665_r13_M-3002.pdf (583.8Kb)
Date
1954-08-26Abstract
Concurrence with IBM is scheduled for display system and MRI specifications. MTC has been reassembled and will be fully operational by September 1. Components of the 13 most frequently used circuits are to be released for ordering (for 2 Production Systems) in September. First floor equipment layout for production systems is being finalized. Requirements for Power System for production system has been released through the Production Coordination Office.