dc.description.abstractThis interval is the first month in which IBM is operating under prime contract with the Air Force. The Lincoln Subcontract has been extended to July 31, 1953 to permit acquisition of certain items of test equipment. Collaboration on engineering work and design has continued in the same way as during the Lincoln Subcontract.en_US