Search
Now showing items 1-7 of 7
SAGE System meeting, 5 March 1956
(Lincoln Laboratory - Division 6, 1956-03-05)
Minutes of weekly SAGE System meeting discussing results of ESS Data Circuit Compatibility Meeting, test concept memoranda, AEW with SAGE, SAGE Bomarc meeting results, McGuire installation planning, F102A, and meeting ...
SAGE System meeting, 2 April 1956
(Lincoln Laboratory - Division 6, 1956-04-02)
Minutes of weekly SAGE System meeting discussing policy concerning personnel to be sent to SAGE sites, IM/99 compatibility, AA study, convertors for Bell Data Service in ESS, IBM coordination, magnetic tapes, BTL visit, ...
SAGE System meeting, 23 April 1956
(Lincoln Laboratory - Division 6, 1956-04-23)
Minutes of weekly SAGE System meeting discussing Boeing study, Volscan, and delivery of consoles for McGuire.
SAGE System meeting, 26 March 1956
(Lincoln Laboratory - Division 6, 1956-03-26)
Minutes of weekly SAGE System meeting discussing TRACALS, air staff meeting in Washington, and meetings scheduled that week.
SAGE System meeting, 13 February 1956
(Lincoln Laboratory - Division 6, 1956-02-13)
Minutes of weekly SAGE System meeting discussing Group 67 status, teletype equipment for low rate AN/FSQ-7 inputs, McGuire "on site" committee, automatic AAOC, exchange of information with LPO, SAGE operational plan annexes, ...
SAGE System meeting, 14 May 1956
(Lincoln Laboratory - Division 6, 1956-05-14)
Minutes of weekly SAGE System meeting discussing computer time, building work after B.O.D., ADC meetings on weapons integration, access to SAGE sites, memory expansion, and 026 for Group 61.
SAGE System meeting, 28 May 1956
(Lincoln Laboratory - Division 6, 1956-05-28)
Minutes of weekly SAGE System meeting discussing Western Electric representative at McGuire, F102 meeting, BOMARC integration, telephone in building F, TV link to Fort Dawes, program preparation for McGuire, and IBM-Lincoln ...






