Browsing Project Whirlwind Reports by Creator "Taylor, N. H."
Now showing items 1-9 of 9
-
Changes in Prototype or Production Machines
Dodd, S. H.; Everett, R. R.; Taylor, N. H. (Lincoln Laboratory - Division 6, 1954-07-28)The XD-1 and XD-2 Systems have reached a point where changes cannot be made unless mandatory to insure operation. The production design is approaching a similar stage and any suggestions for changes should be made soon. -
Minutes of the IBM-SO concurrence meeting no. 36 held at Lincoln Laboratory 25 August 1955
Dodd, S. H.; Taylor, N. H. (Lincoln Laboratory - Division 6, 1955-08-30)Minutes of an IBM-SO concurrent meeting discussing test equipment for duplex central; PERSELBSN codes; proposal for revision of 723 punch circuits; second floor layout for Building F; LRI monitor breadboard; console equipment ... -
Minutes of the IBM-SO concurrence meeting no. 39 held at Lincoln Laboratory 29 September 1955
Dodd, S. H.; Taylor, N. H. (Lincoln Laboratory - Division 6, 1955-10-03)Minutes of an IBM-SO concurrent meeting discussing maintenance, furniture, fixtures, and miscellaneous nonexpendable items for combined AN/FSQ-7 and AN/FSQ-8 site; drum specifications for the production system; maintenance ... -
Minutes of the IBM-SO concurrence meeting no. 41 held at Lincoln Laboratory 14 October 1955
Dodd, S. H.; Taylor, N. H. (Lincoln Laboratory - Division 6, 1955-10-18)Minutes of an IBM-SO concurrent meeting discussing M-revision of the first floor layout of Building F; display console changes; change to long-range radar input specifications for AN/FSQ-7; changes to display specifications; ... -
Minutes of the IBM-SO concurrence meeting no. 41 held at Lincoln Laboratory 14 October 1955
Dodd, S. H.; Taylor, N. H. (Lincoln Laboratory - Division 6, 1955-10-24)Minutes of an IBM-SO concurrent meeting discussing change to duplex central specifications for the GFI mapper consoles; memory element specification; change to AN/FSQ-7 command post DD desk specifications for the production ... -
Rudiments of Good Circuit Design
Taylor, N. H. (MIT Digital Computer Laboratory, 1953-05-19)Circuits which depend on the absolute stability and reproducibility of components have proved to be unreliable and often impractical for field use. A study of tolerances of a circuit to its component variations, when made ... -
Second source on tubes
Taylor, N. H. (Lincoln Laboratory - Division 6, 1955-05-25)In a letter dated 28 April 1954 from J. W. Forrester to C. McElwain, it was stated that certain tubes are important components in the FSQ-7 which should have a second source. Subsequent action led to a recommendation that ... -
Visitors to Group 62
Taylor, N. H. (MIT Digital Computer Laboratory, 1953-06-16)Memorandum on policies for clearing visitors to Group 62 through Mr. Forrester's office. -
Visits to: Engineering Research Associates, St. Paul, Minnesota; Aircraft Radiation Laboratories, Wright Field, Dayton Ohio; General Precision Laboratories, Pleasantville, New York; and Federal Telecommunication Laboratories, Nutley, New Jersey
Rich, E. S.; O'Brien, J. A.; Taylor, N. H. (MIT Servomechanisms Laboratory - ECD, 1950-01-06)Report discussing the impressions gained on visits to several laboratories and a general evaluation of what they are doing as it may apply to the future activities of Whirlwind.