Project Whirlwind: Recent submissions
Now showing items 821-840 of 1737
-
Group 62 Section Leaders Meeting--April 5, 1954
(Lincoln Laboratory - Division 6, 1954-04-06)IBM will furnish monthly status reports relative to time schedules. MTC will move about June 1 and be operative again about July 15. An initial proposal on the duplex central will be distributed about May 1. A separate ... -
List of Reports Received from IBM, July 1 thru August 31, 1954
(Lincoln Laboratory - Division 6, 1954-09-10)Memorandum listing reports received from IBM between July 1 and August 31, 1954. -
Summary of Lincoln Laboratory Technical Information Releases Pertaining To The Sage System Issued By The Production Coordination Office (Cumulative List Through 30 September 1955)
(Lincoln Laboratory - Division 6, 1955-10-06)The summary is a catalogued listing of Technical Information Releases pertaining to the Sage System that have been issued to date and indicates present status. The Production Coordination Office is an office established ... -
Group 62 Section Leaders Meeting -- March 15, 1954
(Lincoln Laboratory - Division 6, 2009-06-12)Planning for manpower needs of the testing program for XD-1 after installation at Lexington has begun. Release of engineering information for procurement purposes will start in May 1954 for the initial two duplex centrals. ... -
Group 62 Section Leaders Meeting -- May 3, 1954
(Lincoln Laboratory - Division 6, 2009-06-12)The IBM designed light gun has been installed and tested on Cape Cod. Evaluation of sources of prime power and the problem of power interruption is under way. Studies will be under taken concerning the use of transistors ... -
Laboratory Personnel
(Lincoln Laboratory - Division 6, 1954-07-16)Supplement to a memorandum listing Laboratory Personnel of Division 6 - Lincoln Laboratory. This supplement supplies extensions and room numbers which were not available at the time M-2894 was issued. -
Group 62 Section Leaders Meeting - February 15, 1954
(Lincoln Laboratory - Division 6, 1954-02-16)Arrangements to have prime responsibility for certain engineering work placed with MIT have been made in the interest of insuring adherence to July '55 date for system operation. Regular air transportation between Poughkeepsie ... -
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, July 1 thru August 31, 1954
(Lincoln Laboratory - Division 6, 1954-09-09)MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, lighting and power generation for the production systems. These requests were subsequently issued as Lincoln Technical ... -
Paramagnetic Behavior of Ferrites Containing Two Kinds of Magnetic Ions
(Lincoln Laboratory - Division 6, 1955-01-17)The Neel theory of the paramagnetic behavior of susceptibility in ferrimagnetic ferrites is extended to include materials containing two kinds of magnetic ions. The equation of state is derived for the general case of an ... -
Thoughts on Incremental Permeability
(Lincoln Laboratory - Division 6, 1954-09-17)After a short discussion of the factors which influence the incremental permeability, three different methods are discussed which should give a large change in incremental permeability with a change of the biasing field. ... -
Laboratory Personnel
(Lincoln Laboratory - Division 6, 1954-07-12)Memorandum listing Laboratory Personnel of Division 6 - Lincoln Laboratory. -
Biweekly Report, January 24, 1954
(MIT Digital Computer Laboratory, 1954-01-24)Bi-weekly progress report of the Scientific and Engineering Computation Group. -
Group 62 Section Leaders Meeting -- January 4, 1954
(Lincoln Laboratory - Division 6, 2009-06-12)Joint review of plans for power supply system take place this week. A meeting to develop specifications for telephone "data" circuits is scheduled for January 13. Engineering work on the various switching schemes required ... -
Establishing New Procedures for Various Phases of AN/FSQ-7 Program
(Lincoln Laboratory - Division 6, 1954-03-23)Memorandum on a new policy for the establishment of procedures for the adoption of new procedures for the AN/FSQ-7 Program. -
Laboratory Personnel
(Lincoln Laboratory - Division 6, 1954-09-01)Memorandum listing Laboratory Personnel of Division 6 - Lincoln Laboratory. -
Test Results on the DCL Memory Plane
(Lincoln Laboratory - Division 6, 1954-05-28)The DCL plane (C25) is compared with a standard MTC plane which has General Ceramics cores. Except for requiring slightly higher driving currents for maximum output, the DCL plane compares favorably with the MTC planes and ... -
Trip to Burroughs Research Center, Paoli, Pennsylvania, Tuesday, April 27, 1954
(Lincoln Laboratory - Division 6, 1954-04-27)A trip was made to the Burroughs Research Center to discuss magnetic-core computer components and fabrication of metal cores. They are planning to make and improve metal cores and they have used magnetic cores in logical ... -
Summary of Lincoln Laboratory Technical Information Releases (T.I.R.'s) Pertaining to Sage System Issued By The Production Coordination Office (PCO) (Cumulative List Through 31 December 1954)
(Lincoln Laboratory - Division 6, 1955-01-07)The summary is a catalogued listing of Series 1 TIR's pertaining to the Sage System that have been issued to date and indicates present status. The PCO is an office established by the Lincoln Director's Office to serve as ... -
Laboratory Personnel
(MIT Digital Computer Laboratory, 1954-07-12)Memorandum listing Laboratory Personnel of the MIT Digital Computer Laboratory. -
Summary of IBM - MIT Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, June 1 thru June 30, 1954
(Lincoln Laboratory - Division 6, 1954-07-13)The tempo of engineering activity has increased and resulted in an increase in the amount of travel between the two engineering locations. Lincoln approval of additional portions of the system has been issued.