Project Whirlwind: Recent submissions
Now showing items 1201-1220 of 1737
-
Further Work on Nondestructive Read System
(MIT Digital Computer Laboratory, 1953-05-27)The Nondestructive Read System was used on relatively low power levels. Good discrimination between ONE and ZERO could be achieved with β field currents as low as 20 ma and readable signals were contained with 7 ma. -
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1), Combat Information Central -- November 1 thru November 30, 1953
(Lincoln Laboratory - Division 6, 1953-12-07)Principal work during this period has been concerned with the display systems development and reduction of the number of vacuum tubes in the central computer and drum system. Specifications for power equipment, output ... -
Sensing the Slope of Magnetic Memory Output
(MIT Digital Computer Laboratory, 1953-06-19)In the MTC memory, the amplitude of the output voltage is sensed to tell if it is a "one" or a "zero". If the slope of the output is sensed, the "one" to "zero" ratio may be greater. -
An Analytical Review of Neel's Molecular Field Theory of Ferri- and Antiferromagnetism
(Lincoln Laboratory - Division 6, 1953-09-16)Neel's molecular field model of ferrimagnetism is reviewed and it is shown how the magnetization below the Curie point can be calculated as a function of temperature using susceptibility data obtained above the Curie ... -
Group 62 Section Leaders Meeting, November 30, 1953
(Lincoln Laboratory - Division 6, 2009-05-09)Study is underway to reduce the cost of the prototypes to keep within the Project High budget. Items to receive top priority in the next few weeks are listed. -
Summary of IBM - MIT Collaboration, April 1, 1953 to April 27, 1953 inclusive
(MIT Digital Computer Laboratory, 1953-04-30)This period represents the sixth month of the Subcontract between MIT and IBM. The original contract termination date was April 27, 1953. Through an amendment this has been extended to July 31, 1953 to permit purchase and ... -
Group 63 Seminar on Magnetism, Appendix VII, Calculation of Spontaneous Magnetization in the Region of the Curie Temperature
(MIT Digital Computer Laboratory, 1953-05-06)This memo is a summary of an appendix to a Group 63 seminar on magnetism. Topics include calculation of spontaneous magnetization in the region of the curie temperature and the Brillouin function. -
Planning, Scheduling and Administering the AN/FSQ-7 Program: Scheduling Office (Supplement to M-2300)
(Lincoln Laboratory - Division 6, 1953-07-15)This memorandum lists the functions of the Division 6 scheduling office for the AN/FSQ-7 Program. -
Planning, Scheduling and Administering the AN/FSQ-7 Program: Transfer of Responsibility from MIT to IBM (Supplement to M-2300)
(Lincoln Laboratory - Division 6, 1953-07-15)This memorandum outlines procedures for transferring principal responsibility from MIT to IBM. -
Meeting to Decide MTC Memory Selection Scheme, September 16, 1953
(Lincoln Laboratory - Division 6, 1953-09-18)To help settle some of the questions raised by the prospect of having a 4096-register magnetic memory in MTC (See Memorandum M-2361), this meeting of MTC personnel and programmer was arranged. Opinion was heavily in favor ... -
Proposal: Wiring and Construction Practice Specifications for Joint IBM-MIT Use
(MIT Digital Computer Laboratory, 1953-06-05)A meeting of the Joint IBM-MIT Standards Committee on Materials and Processes, held June 4 at M.I.T., agreed on certain soldering and wiring methods. The area of agreement was wide, and the following text outlines what was ... -
Transmittal of Publications to IBM
(MIT Digital Computer Laboratory, 1953-06-08)Uniform procedure for transmittal of M-Memos, E-Notes and other publications of IBM is important. This memo indicates a procedure for handling this type of activity. -
First-Order Cancellation Residue in Rectangular Memory Arrays
(MIT Digital Computer Laboratory, 1953-05-15)Aside from all second-order effects, there is an unwanted output voltage inherent in magnetic-memory arrays due to cores whose half-selected output voltages do not cancel. This voltage is due to two cores in the arrays ... -
Group 63 Seminar on Magnetism: Introduction
(MIT Digital Computer Laboratory, 1953-06-23)This memo is an introduction to a Group 63 seminar on magnetism given by Arthur L. Loeb. Information is provided about the three main divisions of the seminar and the memoranda compiled from notes taken by Norman Menyuk. -
Group 62 Section Leaders Meeting -- November 9, 1953
(Lincoln Laboratory - Division 6, 2009-05-09)Considerable attention was given to a review of the power equipment. The Charactron display system has been selected for AN/FSQ-7. The schedule for the MTC construction work is outlined. -
Visit to IBM, October 23, 1953
(Lincoln Laboratory - Division 6, 1953-10-28)The Tube Laboratory at IBM under Mr. John Little has received the assignment of investigating ferrite memory core production. During the past summer, the study was initiated and although the project is not as yet fully ... -
Bi-weekly Report, February 15, 1952
(MIT Digital Computer Laboratory, 1952-02-15)Bi-weekly progress report of Digital Computer Laboratory research teams. -
Proposal for Reducing the Number of Tubes Used in Driving a Magnetic Matrix Switch
(MIT Digital Computer Laboratory, 1953-06-17)There are two independent questions that must be answered when choosing a switch operating mode: 1. Should the "set" and "reset" windings take part in the selection operation? 2. Should the "bias" drivers be gated? The ... -
Magnetic Devices Inc., a Trip Report
(Lincoln Laboratory - Division 6, 1953-12-15)Magnetic Devices, Inc. of Fredrick, Maryland was visited to determine whether rotary relays showed enough promise for either marginal checking or power distribution use to warrant further investigation. It was our conclusion ... -
Group 63 Seminar on Magnetism, L
(MIT Digital Computer Laboratory, 1953-04-28)This memo is a summary of a Group 63 seminar on magnetism. The discussion of an article by Louis Neel, begun at the previous meeting, was continued.



















