Browsing Project Whirlwind by Title
Now showing items 1062-1081 of 1737
-
-
Interim Report - Revised
(Lincoln Laboratory - Division 6, 1956-10-09)Memo regarding revised 1956 interim report -
Internal Documents on Ferromagnetic and Ferroelectric Cores
(MIT Digital Computer Laboratory, 1952-06-10)A listing of reports, Engineering Notes, and Memoranda on various aspects of the ferromagnetic core activity is presented. -
Internal Documents on Ferromagnetic and Ferroelectric Cores
(MIT Digital Computer Laboratory, 1952-01-18)A listing of reports, Engineering Notes, and Memoranda on various aspects of the ferromagnetic core activity is presented. -
Internal Documents on Ferromagnetic and Ferroelectric Cores
(MIT Digital Computer Laboratory, 1952-01-18)A listing of reports, Engineering Notes, and Memoranda on various aspects of the ferromagnetic core activity is presented. -
Internal Documents on Ferromagnetic and Ferroelectric Cores
(MIT Digital Computer Laboratory, 1953-06-01)A listing of reports, Engineering Notes, and Memoranda on various aspects of the ferromagnetic core activity is presented. -
Internal Documents on Ferromagnetic and Ferroelectric Cores
(MIT Digital Computer Laboratory, 1952-11-26)A listing of reports, Engineering Notes, and Memoranda on various aspects of the ferromagnetic core activity is presented. -
Internal Publications of the Arithmetic Element Section
(MIT Digital Computer Laboratory, 1952-10-07)This memo is a summary of the internal publications of the arithmetic element section. -
Internal Reports of the Transistor Group
(MIT Digital Computer Laboratory, 1952-04-24)This memo is a summary of the internal reports (N and E notes) which have been written by the Transistor Group. -
Interpretation of Memory-Core Specifications
(Lincoln Laboratory - Division 6, 1953-09-22)The only tests applied to all cores are those to determine acceptable values of [subscript r]V[subscript 1]. Other tests are made on a sample basis. Since the memory-core-procurement program is on a development basis, but ... -
Investigation of 7AK7 Processing, Emporium, Pa., March 2, 1948
(MIT Servomechanisms Laboratory, 1948-03-16)Memorandum on a visit by project Whirlwind I research teams to investigate 7AK7 processing at the Sylvania Radio-Tube Plant at Emporium, Pa., March 2, 1948. -
An Investigation of Ferroelectrics for Digital Information Storage
(MIT Department of Electrical Engineering, 1951-11-23)Master's Thesis Proposal: An Investigation of Ferroelectrics for Digital Information Storage. -
An Investigation of Some Parameters which Influence the Magnetic Characteristics of Ferrites
(MIT Department of Electrical Engineering, 1954-09-20)Master's Thesis Proposal: An Investigation of Some Parameters which Influence the Magnetic Characteristics of Ferrites. Recent theories have been advanced concerning the squareness of the hysteresis loop and the dynamics ... -
Joint Group 37 - Group 63 Meeting on Ferrite Research
(Lincoln Laboratory - Division 6, 1953-10-09)Groups 37 and 63 will pool their resources to support a program for obtaining single-crystal ferrites. An evaluation of organizations best equipped to undertake the program is the first step. Microwave line-broadening ... -
Joint Group 37 - Group 63 Meeting on Ferrite Research
(Lincoln Laboratory - Division 6, 1953-10-16)A review of the interest of Group 63 has shown which basic quantities require experimental determination. These include anisotropy, exchange coefficient, and relaxation frequency. Measurements can be made most directly ... -
Joint Meeting on Packaging of WII
(MIT Digital Computer Laboratory, 1953-06-17)Memorandum on a joint meeting on packaging of Whirlwind II. The meeting was opened by Harold Ross of IBM who presented the latest recommendation for the number of types of pluggable units and the types of tubes in each. ... -
Joint MIT--IBM Meeting on Memory-Core Measurement, October 13, 1953
(Lincoln Laboratory - Division 6, 1953-10-20)MIT and IBM will share the core-testing program to obtain 150,000 good cores to January 1, 1954. MIT will perform two thirds of the testing, and IBM (High Street) one third. Cores must be tested at a rate of 15,000 tests ... -
Joint MIT-IBM Meeting on Memory-Core Measurements, September 1-2, 1953
(Lincoln Laboratory - Division 6, 1953-09-04)A two-day joint meeting was held to discuss measurement and evaluation of ferrite memory cores by MIT and IBM. During the first day, at Poughkeepsie, the specifications for selection of cores for the WWI bank-B memory and ... -
Joint MIT-IBM Meeting on Memory-Core Measurements, September 24, 1953
(Lincoln Laboratory - Division 6, 1953-10-02)A Joint MIT-IBM Core Measurement Committee will coordinate core measurement activity at MIT, IBM (High Street and Plant 2), general Ceramics, and RCA Victor. The round robin completed September 24 to calibrate measurement ... -
L-series memoranda [log]
(Lincoln Laboratory - Division 6, 1960-03-30)Index cards logging L-series memoranda that correspond to Division 6 group leaders' meetings.