Masrah al-Malaki
File / Documentation![]()
Name
176277_sv.jpg
Size
5.69 MB
Format
JPEG
Checksum (MD5)
50b726849e84f2ca4aaa54a72aed5594
Creator(s)
architect: Charles Boccara (Tunisian, 1940-)
Time period
creation date: amphitheater, 1986-2001, creation date: opera house interior, begun 1986, incomplete as of 2011
Location
Site: Gueliz (Marakesh, Marrakech, Province de, Morocco)
Cultural context
Moroccan
Description
The Théâtre Royal in Marrakech was designed by Charles Boccara, an architect born in Tunisia who grew up in Morocco. Planning for the theater began in 1978 and construction started in 1986. It was subjected to many stops and starts, and though the inauguration was held on the 19th of September, 2001, only the 1200-seat open-air theater was completed. The interior of the 800-seat opera house remained unfinished as of 2011. Nonetheless, it is considered by many to be an architectural masterpiece with its imposing dome, brick arches, marble decorations, and use of a traditional construction technique/material called "tadelakt." It refers to a nearly highly water resistant type of time plaster that is used on both interior and exterior construction in the region of Marrakech, and which can be applied through different techniques to achieve various visual effects.
exterior, construction on theater, 1993
Work type
Amphitheater (built work)
Opera house
Medium
brick
concrete
marble
plaster
Type
Image
Rights
(c) 1993 Ahmet Ersoy
Access rights
All rights reserved
Persistent Link