Transition system for air defense: estimate of cost and delivery for the initial sector
File / Documentation![]()
Name
MC665_r26_L-84.pdf
Size
2.67 MB
Format
Adobe PDF
Checksum (MD5)
2ae079b12e40ef67e355aa08842087ff
Creator(s)
Division 2 Research Staff
Division 6 Research Staff
Date
1953-02-18
Description
Includes the following information: introduction, conditions on which the estimate is based, the estimated cost, the estimated delivery of equipment, the estimated operating cost for initial sector transition system, items not included in the estimate, plus tables, a figure, and budget.
Series
Project Whirlwind Memo VI L-84
Project Whirlwind Collection, MC665
Type
Technical Report
Language
English
Persistent Link