Summary report no. 19, second quarter, 1949
File / Documentation![]()
Name
MC665_r22_sr-19.pdf
Size
6.23 MB
Format
Adobe PDF
Checksum (MD5)
9e5fede3bf7cebc85a49f99bc462a5c2
Creator(s)
Project Whirlwind Research Staff
Date
2009-06-15T22:28:09Z
Description
Includes: foreword; quarterly review, summary schedule Jan. 1949-Dec. 1949 and summary schedule July 1949-June 1950; system engineering, installation and testing of WWI, system testing the arithmetic element of WWI, constant-frequency restoration and the clock pulse control, and revised orders in the Whirlwind computer; circuits and components, five digit multiplier reliability, life of vacuum tubes in WWI, and list of WWI component failures; electrostatic storage, tube construction, testing, and storage tube circuits; input-output; mathematics and applications, calculation of correlation functions, investigation of the Gauss-Seidel Iterative Method, control systems to operate with the WW computer, and solution of power network problems; appendix, visitors, reports and publications.
Includes summary table of Whirlwind I schedules.
Series
MIT DIC 6345
Project Whirlwind Summary Report SR-19
Project Whirlwind Collection, MC665
Type
Technical Report
Language
English
Persistent Link