Lincoln-proposed schedule modifications covering 8-month period for installation and test of first direction center
(Lincoln Laboratory - Division 6, 1955-01-19)Memorandum proposing to reduce by 14 weeks that time requirement scheduled by the ADES Engineering-Installation Phasing Subcommittees for the first SAGE installation, test, and program checking period. -
SAGE system meeting, March 7, 1955
(Lincoln Laboratory - Division 6, 1955-03-07)Minutes of weekly SAGE System meeting discussing display and manual inputs, SAGE operational plan, programmer meeting of March 4, status of items referred to ADES, and SAGE experimental subsector approval committee.