dc.coverage.spatial | Site: Page (Arizona, United States) | en_US |
dc.coverage.temporal | creation date: 1956-1966 | en_US |
dc.creator | unknown (American) | en_US |
dc.date | 1956-1966 | en_US |
dc.date.accessioned | 2011-08-09T19:21:54Z | |
dc.date.available | 2011-08-09T19:21:54Z | |
dc.date.issued | 1956-1966 | en_US |
dc.identifier | 131773 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.3/68934 | en_US |
dc.description | general view, gravity-arch dam under construction; while the finished product is a smooth continuous form, the construction process shown here is one of assemblage; the concrete is poured in alternating blocks to control shrinkage and temperature, 1962 | en_US |
dc.format.medium | concrete | en_US |
dc.relation.ispartof | 138845 | en_US |
dc.rights | (c) Barry Zevin | en_US |
dc.subject | Dams | en_US |
dc.subject | Colorado River (Colo.-Mexico) | en_US |
dc.subject | Water-supply | en_US |
dc.subject | Architecture, Modern --20th century | en_US |
dc.subject | Architecture --United States | en_US |
dc.subject | Hydraulic structures | en_US |
dc.subject | Civil engineering | en_US |
dc.subject | Glen Canyon Dam (Ariz.) | en_US |
dc.subject | Double-sided Surfaces | en_US |
dc.title | Glen Canyon Dam | en_US |
dc.type | Image | en_US |
dc.rights.access | All rights reserved | en_US |
dc.identifier.vendorcode | 051120-001-AZ.tif | en_US |
vra.culturalContext | American | en_US |
vra.technique | construction | en_US |
vra.worktype | Dam | en_US |
dc.contributor.display | unknown (American) | en_US |