dc.contributor.author | Taylor, N. H. | en_US |
dc.date.accessioned | 2009-06-17T20:18:49Z | |
dc.date.available | 2009-06-17T20:18:49Z | |
dc.date.issued | 1955-05-25 | en_US |
dc.identifier | MC665_r28_L-204 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.3/41503 | |
dc.description | This note emphasizes two minimum requirements on any program if it is to meet over-all System requirements: interchangeability of tubes from the two sources and process and quality control at each source. | en_US |
dc.description.abstract | In a letter dated 28 April 1954 from J. W. Forrester to C. McElwain, it was stated that certain tubes are important components in the FSQ-7 which should have a second source. Subsequent action led to a recommendation that a second source for each of these types be set up. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Lincoln Laboratory - Division 6 | en_US |
dc.relation.ispartofseries | Division 6 Limited Memo 6L-204 | en_US |
dc.relation.ispartofseries | Project Whirlwind Collection, MC665 | en_US |
dc.subject.other | SR-1782A/3002420 | en_US |
dc.subject.other | Prototype 7AK7 | en_US |
dc.subject.other | Z-2177 | en_US |
dc.title | Second source on tubes | en_US |
dc.type | Technical Report | en_US |