dc.descriptionIncludes the following information: introduction, conditions on which the estimate is based, the estimated cost, the estimated delivery of equipment, the estimated operating cost for initial sector transition system, items not included in the estimate, plus tables, a figure, and budget.en_US
dc.description.abstractIn Lincoln Laboratory Technical Memorandum No. 20, which describes the proposed Transition System for Air Defense, Section VIII indicates that a study was being made regarding the cost and time factors for an initial sector. This memorandum summarizes this information for a proposal representing the best way to provide the maximum amount of coverage at the earliest practical date.en_US
dc.language.isoenen_US
dc.publisherLincoln Laboratory - Division 6en_US
dc.relation.ispartofseriesProject Whirlwind Memo VI L-84en_US
dc.relation.ispartofseriesProject Whirlwind Collection, MC665en_US
dc.subject.otherTransition Air Defense Systemen_US
dc.subject.otherradar setsen_US
dc.subject.otherground-to-air automatic digital data linken_US
dc.titleTransition system for air defense: estimate of cost and delivery for the initial sectoren_US
dc.typeTechnical Reporten_US