Show simple item record

dc.contributor.authorWatt, C. W.en_US
dc.date.accessioned2009-06-15T20:33:47Z
dc.date.available2009-06-15T20:33:47Z
dc.date.issued1956-02-13en_US
dc.identifierMC665_r16_M-4160en_US
dc.identifier.urihttp://hdl.handle.net/1721.3/40669
dc.descriptionIncludes figure of time lost in various areas of XD-1 in Jan 1956.en_US
dc.description.abstractMeetings between MIT-IBM personnel will be held periodically to discuss equipment troubles. This meeting was the first of the series; tape drive troubles and XD-1 maintenance policy in general were discussed. IBM believes that the practice of cleaning the tape mechanism every 8 hours will markedly reduce tape failures, which caused about 25% of all MIT lost time in January. It was agreed that Group 67 and IBM would work closely to try to determine the exact nature of tape failures. In the future when errors of any sort appear in XD-1 a serious attempt will be made by IBM Maintenance personnel to correct them on the spot rather than wait until routine maintenance periods.en_US
dc.language.isoenen_US
dc.publisherLincoln Laboratory - Division 6en_US
dc.relation.ispartofseriesDivision 6 Memo M-4160en_US
dc.relation.ispartofseriesProject Whirlwind Collection, MC665en_US
dc.titleMIT-IBM maintenance liaison meeting no.1en_US
dc.typeTechnical Reporten_US


Files in this item

This item appears in the following Collection(s)

Show simple item record