Show simple item record

dc.contributor.authorKromer, A. P.en_US
dc.date.accessioned2009-06-12T22:14:21Z
dc.date.available2009-06-12T22:14:21Z
dc.date.issued1954-06-17en_US
dc.identifierMC665_r13_M-2875en_US
dc.identifier.urihttp://hdl.handle.net/1721.3/40360
dc.description.abstractPlans to establish engineering control of inspection and test of prototype system have been initiated. MRI design by IBM is delayed pending a Lincoln decision regarding method of relaying information from P site to Direction Center. Initial hardware for the central display system is being constructed at Division 7, Lexington. Modification to the logic for the radar drum field is to be made to convert the parity bit to an information bit. Provisions to cool XD-1 by use of outside air in emergency are to be incorporated in the system.en_US
dc.language.isoenen_US
dc.publisherLincoln Laboratory - Division 6en_US
dc.relation.ispartofseriesProject Whirlwind Memo M-2875en_US
dc.relation.ispartofseriesProject Whirlwind Collection, MC665en_US
dc.titleSection Leader Meeting Group 62, June 14, 1954en_US
dc.typeTechnical Reporten_US


Files in this item

This item appears in the following Collection(s)

Show simple item record