Search the Libraries' digital collections -- images, media, maps, and more...

Group 62 Section Leaders Meeting -- December 14, 1953

Dome Repository

Show item record

dc.contributor.author Kromer, A. P. en_US
dc.date.accessioned 2009-05-09T05:07:54Z
dc.date.available 2009-05-09T05:07:54Z
dc.date.issued 2009-05-09T05:07:54Z
dc.identifier MC665_r06_M-2574.pdf en_US
dc.identifier.uri http://hdl.handle.net/1721.3/39441
dc.description.abstract SDV demodulator circuitry has been reviewed and accepted. Phone line transmission characteristics are being determined in conjunction with Bell Laboratories Project ADES personnel. Simplification of equipment to handle inputs having a relatively slow data rate is under study. Coordination of output system and equipment development is to be done by a joint IBM--Div. 6--Div 2 committee. Formalizing of the release for design completion and for construction of the two prototype systems is to be outlined in M-2575. Operational aspects of the display equipment for both Direction Center and Combat Center are being considered jointly by Lincoln, ADES and ADC. en_US
dc.language.iso en en_US
dc.publisher Lincoln Laboratory - Division 6 en_US
dc.relation.ispartofseries Project Whirlwind Memo M-2574 en_US
dc.relation.ispartofseries Project Whirlwind Collection, MC665 en_US
dc.title Group 62 Section Leaders Meeting -- December 14, 1953 en_US
dc.type Technical Report en_US


Files in this item

MC665_r06_M-2574.pdf 1.103Mb PDF

This item appears in the following Collection(s)

Show item record

Search Dome



Browse