Search
Now showing items 1-10 of 182
Laboratory Personnel
(MIT Digital Computer Laboratory, 1954-03-01)
Memorandum listing Laboratory Personnel of the MIT Digital Computer Laboratory.
Biweekly Report, January 24, 1954
(MIT Digital Computer Laboratory, 1954-01-24)
Bi-weekly progress report of the Scientific and Engineering Computation Group.
Group leaders' meeting, May 24, 1954
(Lincoln Laboratory - Division 6, 1954-05-26)
Minutes of weekly group leader meeting discussing visit of Air Division commanders, visit to General Electric, duplex central planning report, tubes for FSQ-7, meeting with ADC and ADES during week of May 17, discussion ...
Test Results on the DCL Memory Plane
(Lincoln Laboratory - Division 6, 1954-05-28)
The DCL plane (C25) is compared with a standard MTC plane which has General Ceramics cores. Except for requiring slightly higher driving currents for maximum output, the DCL plane compares favorably with the MTC planes and ...
Section Leaders Meeting, September 20, 1954
(Lincoln Laboratory - Division 6, 1954-09-21)
Section Leaders Meeting will be held on Friday afternoon henceforth. Pulse line termination method is proving troublesome in XD-1 testing. Phone line demodulator design should attempt to avoid necessity of individual tuning ...
Laboratory Personnel
(Lincoln Laboratory - Division 6, 1954-09-01)
Memorandum listing Laboratory Personnel of Division 6 - Lincoln Laboratory.
Bondeze Magnetic Wire for Memory-Plane Construction
(Lincoln Laboratory - Division 6, 1954-08-27)
The possible eventual breakdown of the Quadruple Formex insulation in memory planes due to the abrasive action of vibrating memory cores could be prevented by wiring the planes with Bondeze #3 Magnetic wire. The resulting ...
Group 62 Section Leaders Meeting 24 May, 1954
(Lincoln Laboratory - Division 6, 1954-05-27)
Meetings with Air Force ADC have led to a plan for implementing the Air Division Combat Operations Center with a simplex FSQ-7 and a supplementary large board (projected) display. A procedure to formalize the processing ...
Laboratory Personnel
(Lincoln Laboratory - Division 6, 1954-07-12)
Memorandum listing Laboratory Personnel of Division 6 - Lincoln Laboratory.
A Comparison Between Square-Loop Metals and Ferrites for High-Speed Pulsed Operation
(Lincoln Laboratory - Division 6, 1954-02-04)
Metals and ferrites with rectangular hysteresis loops are used in magnetic amplifiers, switching networks, and data-storage systems. In these applications, the large-signal pulse response is most important. To reduce the ...