Summary of MIT-IBM collaboration - November 1 thru December 31, 1954
(Lincoln Laboratory - Division 6, 1955-01-07)
Summary of the collaboration between MIT and IBM between November 1-December 31, 1954.
Group 62 Section Leaders Meeting 24 May, 1954
(Lincoln Laboratory - Division 6, 1954-05-27)
Meetings with Air Force ADC have led to a plan for implementing the Air Division Combat Operations Center with a simplex FSQ-7 and a supplementary large board (projected) display. A procedure to formalize the processing ...
Group 62 Section Leaders Meeting -- March 22, 1954
(Lincoln Laboratory - Division 6, 1954-03-24)
Agreement was reached to use the Typotron for DID in the XD-1 and subsequent systems. Plans to secure and train additional personnel for system testing and maintenance are under way. A floor layout for the operations areas ...
Group 62 Section Leaders Meeting -- February 23, 1954
(Lincoln Laboratory - Division 6, 1954-02-24)
MIT has started an increased program of assistance in connection with memory design. All future core testing is to be done at IBM. Charactron tubes are to be secured from Convair for XD-1 and XD-2.
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, January 1 thru January 31, 1954
(Lincoln Laboratory - Division 6, 1954-02-09)
Engineering development work has continued on all aspects of the system with emphasis on display and drum circuit switching. IBM requests Lincoln to undertake output digital data transmission equipment development. Design ...
Section Leader Meeting Group 62, June 14, 1954
(Lincoln Laboratory - Division 6, 1954-06-17)
Plans to establish engineering control of inspection and test of prototype system have been initiated. MRI design by IBM is delayed pending a Lincoln decision regarding method of relaying information from P site to Direction ...
Group 62 Section Leaders Meeting, October 25, 1954
(Lincoln Laboratory - Division 6, 1954-10-27)
Reorganization is placing magnetic work in Group 63. Questions regarding XD-1 operation are leading to consideration of change of delivery date. MRI specifications to be completed in approximately 2 weeks. Procedure for ...
Summary of MIT-IBM Engineering Collaboration For The Period September 1 through October 31, 1954
(Lincoln Laboratory - Division 6, 1954-11-04)
Engineering activity level has increased with acceleration of planning and design for the production systems. Specifications for the prototype system (Exhibit AFCRC-l) has been brought up to date. Miscellaneous Radar Inputs ...
Group 62 Section Leaders Meeting, June 21, 1954
(Lincoln Laboratory - Division 6, 1954-06-22)
A conference reached agreement on the display specifications. They are presently being written up for formal concurrence action. SDV demodulator circuits are being reviewed. Initial memory planes for XD-1 System, made at ...
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, July 1 thru August 31, 1954
(Lincoln Laboratory - Division 6, 1954-09-09)
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, lighting and power generation for the production systems. These requests were subsequently issued as Lincoln Technical ...