Search
Now showing items 1-10 of 36
SAGE System meeting, 5 March 1956
(Lincoln Laboratory - Division 6, 1956-03-05)
Minutes of weekly SAGE System meeting discussing results of ESS Data Circuit Compatibility Meeting, test concept memoranda, AEW with SAGE, SAGE Bomarc meeting results, McGuire installation planning, F102A, and meeting ...
SAGE System meeting, 27 February 1956
(Lincoln Laboratory - Division 6, 1956-02-27)
Minutes of weekly SAGE System meeting discussing phone circuit error rates, distribution of weapons integration memorandum, results of Murphy space meeting, ESS presentation at next ADES meeting, ESS changes, height finder ...
SAGE System meeting, 20 February 1956
(Lincoln Laboratory - Division 6, 1956-02-21)
Minutes of weekly SAGE System meeting discussing AN/TSQ-7 output section, report to TAPE on SAGE integration, combat center display slots, subsystems test specifications, and meetings scheduled that week.
Section Leaders Meeting, September 20, 1954
(Lincoln Laboratory - Division 6, 1954-09-21)
Section Leaders Meeting will be held on Friday afternoon henceforth. Pulse line termination method is proving troublesome in XD-1 testing. Phone line demodulator design should attempt to avoid necessity of individual tuning ...
SAGE System meeting, 18 June 1956
(Lincoln Laboratory - Division 6, 1956-06-18)
Minutes of weekly SAGE System meeting discussing D. C. Building redesign, schedule readjustments, XD-1 reliability, and radar orientation.
SAGE System meeting, 2 April 1956
(Lincoln Laboratory - Division 6, 1956-04-02)
Minutes of weekly SAGE System meeting discussing policy concerning personnel to be sent to SAGE sites, IM/99 compatibility, AA study, convertors for Bell Data Service in ESS, IBM coordination, magnetic tapes, BTL visit, ...
SAGE System meeting, 21 May 1956
(Lincoln Laboratory - Division 6, 1956-05-21)
Minutes of weekly SAGE System meeting discussing improved GFI mapper, dictionary of SAGE terms, SAGE study group, status and failure reporting, and BOMARC operational plan.
SAGE System meeting, 23 April 1956
(Lincoln Laboratory - Division 6, 1956-04-23)
Minutes of weekly SAGE System meeting discussing Boeing study, Volscan, and delivery of consoles for McGuire.
SAGE System meeting, 26 March 1956
(Lincoln Laboratory - Division 6, 1956-03-26)
Minutes of weekly SAGE System meeting discussing TRACALS, air staff meeting in Washington, and meetings scheduled that week.
SAGE System meeting, 13 February 1956
(Lincoln Laboratory - Division 6, 1956-02-13)
Minutes of weekly SAGE System meeting discussing Group 67 status, teletype equipment for low rate AN/FSQ-7 inputs, McGuire "on site" committee, automatic AAOC, exchange of information with LPO, SAGE operational plan annexes, ...