Search
Now showing items 1-10 of 141
SAGE system meeting, January 24, 1955
(Lincoln Laboratory - Division 6, 1955-01-27)
Minutes of weekly SAGE System meeting discussing proposed change in procedure, charactron display, Mark X radar, exhibit AFCRC 17, direction center floor plan changes, Lincoln Laboratory visiting committee, test specifications ...
Group leaders' meeting, August 17, 1953
(Lincoln Laboratory - Division 6, 1953-08-18)
Minutes of weekly group leader meeting discussing air conditioning for WWI, microfilm copies of WWI drawings, purchasing at IBM, personnel estimate for fiscal 1954, FSQ-7 installation in Lexington, space in Lexington, and ...
Group leaders' meeting, May 24, 1954
(Lincoln Laboratory - Division 6, 1954-05-26)
Minutes of weekly group leader meeting discussing visit of Air Division commanders, visit to General Electric, duplex central planning report, tubes for FSQ-7, meeting with ADC and ADES during week of May 17, discussion ...
A Comparison Between Square-Loop Metals and Ferrites for High-Speed Pulsed Operation
(Lincoln Laboratory - Division 6, 1954-02-04)
Metals and ferrites with rectangular hysteresis loops are used in magnetic amplifiers, switching networks, and data-storage systems. In these applications, the large-signal pulse response is most important. To reduce the ...
Group leaders' meeting, January 25, 1954
(Lincoln Laboratory - Division 6, 1954-01-26)
Minutes of weekly group leader meeting discussing MIT-IBM concurrence procedure, IBM budget, ADES and IBM, IBM visit on January 28, charactron development at Convair, organization of the Division 6 standards group, obsolete ...
Group leaders' meeting, June 21, 1954
(Lincoln Laboratory - Division 6, 1954-06-22)
Minutes of weekly group leader meeting discussing move to Lexington, meetings at IBM during week of June 21, typotron procurement, working hours at Lexington, and salary review.
Group leaders' meeting, February 2, 1953
(MIT Digital Computer Laboratory, 1953-02-04)
Minutes of weekly group leader meeting discussing possible moves to Lexington, computer time schedule, and organization of magnetic-materials group.
Group leaders' meeting, June 7, 1954
(Lincoln Laboratory - Division 6, 1954-06-07)
Minutes of weekly group leader meeting discussing concurrence on production FSQ-7's, failure of FSQ-7 primary power, S. E. Desjardins, clearance for IBM visits, Air Force meeting on FSQ-7 prototype program, quality control ...
Group leaders' meeting, March 31, 1952
(MIT Digital Computer Laboratory, 1952-04-02)
Minutes of weekly group leader meeting discussing the third shift for Whirlwind I, methods of speeding up the program other than adding men to the staff, responsibilities in magnetic work, and indoctrination program.
Group leaders' meeting, July 13, 1953
(MIT Digital Computer Laboratory, 1953-07-17)
Minutes of weekly group leader meeting discussing order for FSQ-7 cores, Lincoln Laboratory mail pickup, clearance for publications, tape preparation for MTC, use of WWI by Adams' Group, identification of reports, component ...