Group 62 Section Leaders Meeting - February 15, 1954
(Lincoln Laboratory - Division 6, 1954-02-16)
Arrangements to have prime responsibility for certain engineering work placed with MIT have been made in the interest of insuring adherence to July '55 date for system operation. Regular air transportation between Poughkeepsie ...
Group 62 Section Leaders Meeting, July 26, 1954
(Lincoln Laboratory - Division 6, 1954-07-27)
Effective use of Lincoln manpower contemplates the use of small groups in certain areas and reinforcement of personnel in other areas of activity; namely the Systems Office, Frame Testing, and Duplex Planning. Marginal ...
Division 6 production coordination office
(Lincoln Laboratory - Division 6, 1955-02-10)
Memorandum asking Division 6 staff to keep the Production Coordination Office informed regarding all work being done and that copies of all correspondence, conference minutes, etc. be directed to the PCO.
Group 62 Section Leaders Meeting, September 24, 1954
(Lincoln Laboratory - Division 6, 1954-09-27)
Active consideration is being given to having IBM - Endicott take on the engineering responsibility for the Central Display System (Fallows' work) and the associated expanded display (projection). Combined frame testing ...
Summary of IBM - MIT Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, May 1 thru May 31, 1954
(Lincoln Laboratory - Division 6, 1954-06-24)
Joint engineering activity has resulted in engineering concurrence and Lincoln approval of additional portions of the system. Completion of the review of the display system has resulted in agreement on certain changes to ...
Group 62 Section Leaders Meeting--April 20, 1954
(Lincoln Laboratory - Division 6, 1954-04-21)
The Transition Systems inputs, duplex operation concepts, weapons control capabilities, phone line transmission requirements were discussed at a recent conference with Air Force and ADES representatives. The display selection ...
Group 62 Section Leaders Meeting, October 8, 1954
(Lincoln Laboratory - Division 6, 1954-10-13)
Central display equipment for production systems will be engineered by Ralph Mork at IBM Vestal. Plans for manufacture of certain portions of the system by IBM will be crystallized this week. Technical discussions regarding ...
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, April 1 thru April 30, 1954
(Lincoln Laboratory - Division 6, 1954-05-08)
Cape Cod System demonstrations were given to four groups of IBM (Project High) personnel. Diode switching of read-write circuits in drum system has been selected for the prototypes and initial duplex centrals. The central ...
Section Leader Minutes - Meeting of June 5, 1954
(Lincoln Laboratory - Division 6, 1954-06-08)
The Air Force is establishing a Joint Progress Office -- JPO -- to coordinate administrative activity for the Transition System Program. Col. R. Osgood will be chairman. The Lincoln Production Coordination Office has been ...
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1), Combat Information Central -- December 1 thru December 31, 1953
(Lincoln Laboratory - Division 6, 1954-01-08)
Collaboration between Lincoln and IBM engineering groups has continued on all phases of development and planning for the program. Some design specifications were formally approved and released to IBM by Lincoln.