Search
Now showing items 31-40 of 128
MIT-IBM maintenance liaison meeting no.1
(Lincoln Laboratory - Division 6, 1956-02-13)
Meetings between MIT-IBM personnel will be held periodically to discuss equipment troubles. This meeting was the first of
the series; tape drive troubles and XD-1 maintenance policy
in general were discussed. IBM believes ...
Biweekly Report for Period Ending 6 April 1956
(Lincoln Laboratory - Division 6, 1956-04-13)
Bi-weekly progress report of Division 6 research teams.
SAGE System meeting, 13 February 1956
(Lincoln Laboratory - Division 6, 1956-02-13)
Minutes of weekly SAGE System meeting discussing Group 67 status, teletype equipment for low rate AN/FSQ-7 inputs, McGuire "on site" committee, automatic AAOC, exchange of information with LPO, SAGE operational plan annexes, ...
SAGE System meeting, 4 June 1956
(Lincoln Laboratory - Division 6, 1956-06-06)
Minutes of weekly SAGE System meeting discussing additional testing at McGuire, IBM-Lincoln meeting, and program schedule.
Biweekly Report for Period Ending 24 February 1956
(Lincoln Laboratory - Division 6, 1956-03-01)
Bi-weekly progress report of Division 6 research teams.
Personnel list
(Lincoln Laboratory - Division 6, 1956-03-01)
List of Division 6 personnel at Lincoln Laboratory in 1956.
Biweekly Report for Period Ending 9 March 1956
(Lincoln Laboratory - Division 6, 1956-03-16)
Bi-weekly progress report of Division 6 research teams.
Group leaders' meeting - May 21, 1956
(Lincoln Laboratory - Division 6, 1956-05-23)
Minutes of weekly group leader meeting discussing acting group leader—Group 63, time cycle and tracking capacity, program redesign, combat center program, assembly test, Cape Cod, and committee "A."
Committee-236 meeting minutes (fifth meeting, 15 February 1956)
(Lincoln Laboratory - Division 6, 1956-02-24)
Minutes of the Committee-236 meeting discussing ESS problem areas outlined in 6L-242, group responsibilities and schedules, extension of scope of Committee 236, ESS maintenance coordination planning, over-all test program, ...
EPSCOM Biweekly Report for 15 June 1956
(Lincoln Laboratory - Division 6, 1956-06-20)
The EPSCOM force still stands at 40 people. A summary chart and schedule is included along with reports from programmers..