Group 62 Section Leaders Meeting - June 7, 1954
(Lincoln Laboratory - Division 6, 1954-06-08)
The contract for construction of Building B started June 7th. A study group is being set up to investigate a smaller and faster computer for air defense at advanced locations. IBM is now back scheduled an average of six ...
Group leaders' meeting, June 7, 1954
(Lincoln Laboratory - Division 6, 1954-06-07)
Minutes of weekly group leader meeting discussing concurrence on production FSQ-7's, failure of FSQ-7 primary power, S. E. Desjardins, clearance for IBM visits, Air Force meeting on FSQ-7 prototype program, quality control ...
Group 62 Section Leaders Meeting, June 21, 1954
(Lincoln Laboratory - Division 6, 1954-06-22)
A conference reached agreement on the display specifications. They are presently being written up for formal concurrence action. SDV demodulator circuits are being reviewed. Initial memory planes for XD-1 System, made at ...
Multi-Coordinate Selection Systems for Magnetic-Core Storage
(Lincoln Laboratory - Division 6, 1954-08)
For many computational applications there is a need for a high-speed digital computer with a large internal memory capacity. The search for a reliable random-access memory with a fast information-access time brought about ...
Secret supplement to Biweekly Report for July 2, 1954
(Lincoln Laboratory - Division 6, 1954-07-02)
Memorandum detailing the modification of the F-99 interception stimulation program and a permutation program written to generate 600 situations.
Summary of MIT-IBM Collaboration on Design of AN/FSQ-7 (XD-1) Combat Information Central, July 1 thru August 31, 1954
(Lincoln Laboratory - Division 6, 1954-09-09)
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, lighting and power generation for the production systems. These requests were subsequently issued as Lincoln Technical ...
Group 62 Section Leaders Meeting - September 7, 1954
(Lincoln Laboratory - Division 6, 1954-09-17)
Portions of Project High have been reorganized. Assembly and test of XD-1 is progressing very well. The Charactron is being tested with MTC.
Group 62 Section Leaders Meeting - February 15, 1954
(Lincoln Laboratory - Division 6, 1954-02-16)
Arrangements to have prime responsibility for certain engineering work placed with MIT have been made in the interest of insuring adherence to July '55 date for system operation. Regular air transportation between Poughkeepsie ...
X-Ray Equipment for Magnetic Research
(Lincoln Laboratory - Division 6, 1954-07-29)
After an examination of the manner in which x-ray techniques may be applied to a magnetic materials research program, the applications most meaningful to our particular interests have been selected. It is apparent that our ...
Group 62 Section Leaders Meeting, July 26, 1954
(Lincoln Laboratory - Division 6, 1954-07-27)
Effective use of Lincoln manpower contemplates the use of small groups in certain areas and reinforcement of personnel in other areas of activity; namely the Systems Office, Frame Testing, and Duplex Planning. Marginal ...